Similar Projects
Maintenance of Supplemental Cooling Systems
Term Contract
Bidding
Atlanta, GA 30334

LK Moss HVAC Replacement
Bidding
Buena Vista, GA 31803

Replace Boiler and Cooling Tower at Douglass High School
Sub-Bidding
Atlanta, GA 30318

Prequalified Contractors List
Post-Bid
East Point, GA

HVAC Air Filters and Related Supplies
Term Contract
Post-Bid
Atlanta, GA 30303

Multi-Site HVAC Rooftop and PTAC Unit Replacement
Results
Atlanta, GA 30324

Sparks Hall Phase 1 HVAC Upgrades
Results
Less than $1,257,900 est. value
Atlanta, GA 30302

Clarkston Campus CD Building Install Screw Chiller and Replace AHU Cooling Coil
Post-Bid
Less than $910,000 est. value
Atlanta, GA 30302

Replace 1st and 2nd Floor HVAC Units, Clarkston Campus, Bldg
Results
Atlanta, GA 30302

City Hall HVAC Purification System
Post-Bid
Alpharetta, GA 30009

Mechanical Contractor Services - Decatur Campus Building SB Replace Air-Cooled Condensers and AHU DX Cooling Coils
Results
Less than $980,000 est. value
Atlanta, GA 30302

Rialto and Haas-Howell HVAC Upgrades
Post-Bid
Less than $850,000 est. value
Atlanta, GA 30302

Design of Replacement Air Handling Unit
Results
Less than $1,400,000 est. value
Atlanta, GA 30313

HVAC and Mechanical Products
Term Contract
Post-Bid

Kitchen Exhaust System Maintenance Services
Term Contract
Results
Less than $12,000 est. value
GA

Last Updated 02/14/2020 12:22 PM
Project Title

GT Campus Recreation Center Chiller Replacement

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30318   (Fulton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. This project is for the replacement of the centrifugal chiller serving the CRC building’s cooling needs. The replacement equipment will be a multi-compressor centrifugal chiller sized at 730 tons. The five compressor selection is sized to meet both the peak loading during summer events where the swim/dive auditorium is fully occupied as well as the minimum loads in the off-season. Primary pumps and associated piping will also be replaced. The chiller equipment pad as well as the slab below will be replaced with an isolated equipment pad for the new chiller. Refrigerant safety devices, alarming and signage will be replaced. 2. The Contractor will Provide a 500 ton air-cooled rental chiller for the duration of construction and all necessary temporary hoses, valves, power connections, etc necessary to maintain cooling during the winter months. This chiller will be located in parking spots adjacent to the chiller plant. 3. The CRC Chiller Plant will need to operate during construction. The contractor shall provide temporary piping during construction to allow an owner-provided air-cooled chiller to serve the facility during construction. Careful consideration shall be made with respect to installation sequencing and equipment outages. Refer to section 011001 – Project Phasing for additional phasing restrictions.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents