Similar Projects
Last Updated | 07/19/2023 03:00 PM |
Project Title | Millecoquins Trail No. 2 Bridge Repair Project |
Physical Address | View project details and contacts |
City, State (County) | Garfield Township, MI 49684 (Grand Traverse County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $385,358 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is located at the Millecoquins Snowmobile Trail No. 2 Bridge. Project includes replacement of existing timber bearing pads with timber pile, pile cap, backwall, and wingwalls. Project also includes installation of riprap slope protection and replacement of timber bridge deck. Additional Site Walkthrough Info: NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. COVID 19 Precautions: 1. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed. ACCEPTING QUESTIONS UNTIL: March 7, 2023 at 12:00 PM EST 751/21024.TAP This project is located at the Millecoquins Snowmobile Trail No. 2 Bridge. Project includes replacement of existing timber bearing pads with timber pile, pile cap, backwall, and wingwalls. Project also includes installation of riprap slope protection and replacement of timber bridge deck. Furnish all equipment, materials, labor, and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation, and disposal of the waste generated at the construction site for the Owner's review and approval. The Contractor will be required to produce waste management progress reports. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |