Similar Projects
Union Street Dam Improvements - 168-19-CIP - City of Traverse City
Renovation, Infrastructure
Conception
$19,600,000 CJ est. value
Traverse City, MI 49684

Eighth Street- Lake Avenue to Woodmere - 882-18-CIP - City Of Traverse City
Infrastructure
Conception
$10,550,000 CJ est. value
Traverse City, MI 49684

3566 North US 31 Multi Tenant
New Construction, Infrastructure - 6,800 SF
Design
$2,000,000 CJ est. value
Traverse City, MI 49684

Fairfield Hotel
New Construction, Infrastructure - 53,124 SF
Design
$14,000,000 CJ est. value
Traverse City, MI 49684

Senior Center Building
Demolition, New Construction, Infrastructure - 12,000 SF
Bidding
$3,680,000 CJ est. value
Traverse City, MI 49686

N West Silver Lake Road Sanitary Sewer Extension
Infrastructure
Bidding
$300,000 CJ est. value
Garfield Township, MI 49685

Keystone/River Road Roundabout Construction
Alteration
Post-Bid
Traverse City, MI

Bridge Support - Epoxy and Healer Sealer
Renovation, Infrastructure
Post-Bid

Broomhead Road Timber Bridge
New Construction, Infrastructure
Results
Traverse City, MI 49696

2023 Madison Jefferson Reconstruction Project
Infrastructure
Results
$3,730,352 CJ est. value
Traverse City, MI 49684

Marriott Tribute
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Traverse City, MI 49684

Hammond Road Apartments
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Traverse City, MI 49686

New Headquarters and Operations Center - Bay Area Transportation Authority
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Traverse City, MI 49684

Water Treatment Plant - City Of Traverse City
Infrastructure, Renovation
Conception
$6,529,000 CJ est. value
Traverse City, MI 49684

Self-Storage Facility/ Long Lake Township
New Construction, Infrastructure - 3 SF
Design
$5,940,000 CJ est. value
Garfield Township, MI 49684

Last Updated 07/19/2023 03:00 PM
Project Title

Millecoquins Trail No. 2 Bridge Repair Project

Physical Address View project details and contacts
City, State (County) Garfield Township, MI 49684   (Grand Traverse County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $385,358 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located at the Millecoquins Snowmobile Trail No. 2 Bridge. Project includes replacement of existing timber bearing pads with timber pile, pile cap, backwall, and wingwalls. Project also includes installation of riprap slope protection and replacement of timber bridge deck. Additional Site Walkthrough Info: NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. COVID 19 Precautions: 1. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed. ACCEPTING QUESTIONS UNTIL: March 7, 2023 at 12:00 PM EST 751/21024.TAP This project is located at the Millecoquins Snowmobile Trail No. 2 Bridge. Project includes replacement of existing timber bearing pads with timber pile, pile cap, backwall, and wingwalls. Project also includes installation of riprap slope protection and replacement of timber bridge deck. Furnish all equipment, materials, labor, and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation, and disposal of the waste generated at the construction site for the Owner's review and approval. The Contractor will be required to produce waste management progress reports.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents