Similar Projects
Sanitary and Storm Sewer Master Plans
New Construction
Post-Bid
Sioux City, IA

Comprehensive Plan 2021 - 2040
New Construction
Post-Bid
$80,000 to $120,000 est. value
North Liberty, IA

Architecture and Engineering Services for New Fire Station 3
New Construction
Results
Davenport, IA 52806

Design Concepts for Multi-Use Library Facility
Infrastructure
Results
Cedar Rapids, IA

Indefinite Scope of Professional Services – Structural Engineering Design Services
Term Contract
Post-Bid
Cedar Falls, IA

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Phased Application Engineering Services
Infrastructure
Post-Bid
Storm Lake, IA

Engineering Services - Water Pollution Control Plant and Compost Facility Flood Protection System
Alteration
Results
Davenport, IA

Engineering Services
Infrastructure
Post-Bid
Parkersburg, IA

GRC 212-214 and 717 Main Road Tunnel Repairs and Powerhouse Parking Lot
Infrastructure
Results
Glenwood, IA 51534

Natural Gas Consultant Services
Infrastructure
Post-Bid
Cedar Rapids, IA

Design Services for WRC New Fire Sprinkler Systems
Alteration
Results
Woodward, IA 50276

Traffic Signal Timing Updates Phase 4
Term Contract
Post-Bid
Des Moines, IA

Architectural and Engineer /Design and Construction Management Services
Renovation, Alteration
Results
Des Moines, IA 50314

Public Safety Radio System Analysis
Alteration
Post-Bid
Pella, IA

Last Updated 08/17/2022 03:01 AM
Project Title

RFQ - Riverfront Development Study

Physical Address View project details and contacts
City, State (County) Clinton, IA 52732   (Clinton County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The official clock for purposes of bidding is located in the City Clerks office on the 2nd floor or City Hall. Bids received after the deadline for submission of Requested for Proposal as stated herein shall not be considered and shall be returned to the late bidder unopened. The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents