Similar Projects
Little Ridge Road Warehouse and Distribution Building
New Construction - 151,200 SF
Conception
$10,000,000 CJ est. value
Acworth, GA 30102

Little Ridge Road Warehouse and Distribution Building
New Construction - 151,200 SF
Conception
$10,000,000 CJ est. value
Acworth, GA 30102

Knox Campground Mini-Warehouses and Retail
New Construction - 1,500 SF
Design
Canton, GA 30114

Cherokee Storage
New Construction - 23,850 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Canton, GA 30115

PCS West Property Development
New Construction
Bidding
Garden City, Port Wentworth, GA 31407

County Shop/Storage
New Construction
Bidding
GA

Fulton Industrial Phase II
New Construction - 422,240 SF
Post-Bid
$10,000,000 CJ est. value
Atlanta, GA 31136

Lad Trucking
Renovation - 75,734 SF
Post-Bid
Watkinsville, GA 30677

Project No Knot
Results
GA

HCS Distribution Center
New Construction - 47,361 SF
Results
Less than $6,000,000 est. value
McDonough, GA 30253

Vinings Self-Service Storage
New Construction - 205,796 SF
Construction
$4,200,000 est. value
Smyrna, GA

Fairburn Road Storage
Renovation - 75,600 SF
Construction
$977,600 est. value
Atlanta, GA 30331

Storage
New Construction - 20,910 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Macon, GA 31210

Radium Springs Storage Solutions
New Construction - 36,800 SF
Pending Verification
Albany, GA

Connect Metal Recycling
New Construction - 54,400 SF
Conception
Norcross, GA

Last Updated 04/04/2022 12:37 PM
Project Title

Northwest 75 Logistics Center Buildings A and B

Physical Address View project details and contacts
City, State (County) White, GA 30184   (Bartow County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced December 2020, Construction Complete as of March 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1,420,650 SF - 1 Warehouse/Storage, 1 Story Above Grade, 311,660 SF New Construction, 1 Warehouse/Storage, 1 Story Above Grade, 1,108,990 SF New Construction, 98.45 Acres.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Fire Protection Specialties.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents