Similar Projects
The Avalon Apartment Homes and The Residences at Avalon
New Construction, Infrastructure - 6,658 SF
Design
$190,000,000 CJ est. value
White Lake, MI 48383

Nuisance Abatement (Clean-Up) - Residential Property
Term Contract
Sub-Bidding
Rochester Hills, MI 48307

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Asbestos Abatement at Kettering High School
Term Contract
Post-Bid
Waterford Township, MI 48329

Lahser Asbestos Abatement
Results
Bloomfield Hills, MI 48302

Asbestos Abatement at WHRC
Results
Pontiac, MI 48342

Asbestos Abatement Conant, Way and Bloomfield Hills Middle School South
Alteration
Post-Bid
Bloomfield Hills, Bloomfield Township, MI 48302

Asbestos Abatement at Lessenger School
Results
Oak Park, MI 48237

Underground Storage Tank System Removal and Environmental Work at Farmington Public Schools Maintenance and Operations Facility
Infrastructure, Alteration
Post-Bid
$200,000 est. value
Farmington Hills, MI 48336

Asbestos Abatement
Results
Holly, MI 48442

Statewide Abatement and Remediation Services- Asbestos, Lead, and Mold
Alteration
Post-Bid

Asbestos Abatement at Pontiac High School and Pontiac Middle School
Alteration
Results
Pontiac, MI 48340

Asbestos Abatement at Farmington Community School
Alteration
Post-Bid
$200,000 est. value
Farmington, MI 48334

CBDG Batch 17 - Asbestos Abatement
Alteration
Results
Pontiac, MI

Hazel Park 2022 Crack Sealing Program
Infrastructure
Post-Bid
$900,000 CJ est. value
Hazel Park, MI 48030

Last Updated 09/09/2022 08:33 AM
Project Title

2022 Crack Sealing Program

Physical Address View project details and contacts
City, State (County) Keego Harbor, MI 48320   (Oakland County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Section describes the method of measurement and basis of payment for all items of Work included in the Contract and specified in the Proposal. 1. The Contractor shall provide all labor, material, tools, equipment and services required to complete the Work specified herein and indicated on the Plans and other items necessary to complete the job, whether specifically mentioned or implied. Payment will only be made for the items listed in the Proposal Form. The Owner will make no allowances for items not included in the Proposal Form. This project currently has 1 addendum on it, to obtain these please contact the Owner Directly The project consists of installing approximately 4,000 lbs of joint and crack sealant including the locating, routing and cleaning of the joint/crack in locations throughout the City of Keego Harbor. Project shall be sustainably completed by Saturday, November 19, 2022. Question Acceptance Deadline 09/26/2022 12:00 PM EDT Questions are submitted online No

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents