Similar Projects
Administration Parking Lot Replacement - County of Grundy
Infrastructure
Conception
$650,000 CJ est. value
Morris, IL 60450

Administration Parking Lot Replacement - County of Grundy
Infrastructure
Conception
$650,000 CJ est. value
Morris, IL 60450

Water Distribution System Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Braceville, IL 60407

Water Distribution System Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Braceville, IL 60407

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Seal Coat
Infrastructure
Post-Bid
Morris, IL

Airport Road Improvements
Infrastructure
Results
Morris, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

I-80 Logistics Park
New Construction, Infrastructure - 7,000,000 SF
Pending Verification
$700,000,000 CJ est. value
Minooka, IL 60447

I-80 Logistics Park
New Construction, Infrastructure - 7,000,000 SF
Pending Verification
$700,000,000 CJ est. value
Minooka, IL 60447

Dupont Road Reseal - Grundy County
Infrastructure
Conception
$840,000 CJ est. value
Morris, IL 60450

Coal City 2023 Site Improvements and Asphalt Repairs
Infrastructure
Bidding
$2,000,000 CJ est. value
Coal City, IL 60416

HMA
Infrastructure
Post-Bid
Morris, IL

Engineering Services for Will Road Reconstruction - Phase II and Phase III
Infrastructure
Results
Diamond, IL 60416

Kankakee Road over Granary - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Gardner, IL 60424

Last Updated 04/25/2023 03:33 AM
Project Title

2023 GA Apron Reconstruction and Expansion

Physical Address View project details and contacts
City, State (County) Morris, IL 60450   (Grundy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $973,255 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the full depth reconstruction and expansion of the General Aviation Apron at the Morris Municipal Airport. Construction includes traffic control; pavement removal; excavation & embankment; grading and drainage improvements; asphalt paving; erosion control; turf establishment; and pavement marking. Site Directions: Morris Municipal Airport This project provides for the full depth reconstruction and expansion of the General Aviation Apron at the Morris Municipal Airport. Site work includes pavement removal; excavation and embankment; aggregate base construction; grading; asphalt construction; pavement marking; and turf establishment. Approximate quantities of major items of work are as follows: Mobilization 1 LS Traffic Provisions 1 LS Pavement Removals 9,000 SY Excavation and Embankment 34,000 CY 6" Aggregate Base 13,000 SY 4" Asphalt Pavement 3,100 TN Erosion Control 1 LS Turf Establishment 1 LS Pavement Marking 1 LS 6" PVC Subdrain 1,300 LF 3-27-0069-016-2023

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents