Similar Projects
Floor Tile Replacement South Jackson Head Start Center
Renovation
Sub-Bidding
$200,000 CJ est. value
Jackson, MS 39212

Installation of Volleyball Equipment and Floor Refinishing
Post-Bid
Tupelo, MS

Leake County Schools Toilet Floor Replacement
Post-Bid
$200,000 est. value
Carthage, MS

Carpet Replacement
Results
Jackson, MS

Repair Shower Floor
Results
$250,000 to $500,000 est. value
Yazoo City, MS 39194

Desoto County School District - Hope Sullivan Elementary and Southaven Middle School Flooring
Post-Bid
Southaven, MS 38671

Repair Walls and Floors in Building One - 1967 Wing
Term Contract
Results
$100,000 to $250,000 est. value
Oxford, MS 38655

Dormitory Flooring Installation
Post-Bid
Lorman, MS

Gym Floor Replacement
Alteration
Results
$163,232 est. value
Purvis, MS

Hallway Painting and Flooring Replacement
Alteration
Post-Bid
Gulfport, MS 39503

2021 New Gym Floor for Old Oxford Activity Center
Alteration
Results
Oxford, MS 38655

Public Safety Communications Center Furniture, Consoles and Carpet Replacement
Alteration
Post-Bid
Biloxi, MS

Replacement of Flooring in Various Locations
Alteration
Results
Purvis, MS

Oak Grove Middle School Gym Floor Replacement
Alteration
Post-Bid
Hattiesburg, MS 39402

Olive Branch High School Flooring Project
Alteration
Results
Olive Branch, MS 38654

Last Updated 09/30/2022 11:11 AM
Project Title

Floor Tile Replacement St. Thomas Head Start Center

Physical Address View project details and contacts
City, State (County) Bolton, MS 39041   (Hinds County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Floor Tile Replacement St. Thomas Head Start Center -Both FOA Office in Main Building -Entire Hallway in Main Building -Bathroom next to the Kitchen in Main Building -Storage Closet next to the kitchen in Main Building -Classroom A and closets in Main Building -Water heater room Classrooms D & E and both closets -Classroom B & F to include bathroom and closet -Bathroom A 1. Contractor shall remove all existing tile flooring in each area described above and replace with new Vinyl Plank flooring. 2. Contractor shall install a "Floating Floor" Vinyl Plank application with 3/4 " x 3/4 " quarter round wood base to match existing color. 3. Contractor is to install Floating Floor leaving a minimum of 1/4 " spacing from perimeter wall. 4. Floor Planks are to be installed parallel to entrance doors in all rooms unless informed or instructed otherwise. 5. Floor Planks are to be installed in corridors parallel to corridor walls with a minimum of 1/4 " spacing from perimeter walls. 6. Floating Floor system should not have any gaps, clip edges should be tightly connected strictly per manufactures instructions. Contractor must walk entire building to determine if there are any weak or sagging subflooring. Those areas are to be replaced with tongue and groove 3/4 " CDX plywood if areas are large enough to allow such application. If area is not large enough to use tongue and groove CDX plywood, contractor may us regular CDX plywood same thickness. 7. Contractor shall install 6 mil. thk. visqueen PE film underlayment of new vinyl plank flooring system to provide added moisture protection between subfloor and vinyl plank. 8. Contractor must use proper click fasting tools to install Floating Floor system. Chipped planks will NOT be accepted. Owner will provide color selection of flooring. 9. Contractor is asked to work during regular work hours 7:00 a.m. to 3:00 p.m. However, work hours may change due to administration requirements. 10. Contractor shall remove and reset all toilets, repair or replace flanges, and use Danco Perfect Seal Rings. All toilets are to be 100% free of any leaks. 11. Contractor must check all doors and plane the ones that are too low that may damage new floor planks. Contractor shall plane doors at 1/2 " above finish floor. 12. Contractor shall install new threshold at all exterior doors that will provide a 100% seal. 13. Contractor shall install rubber transitional plates (same color of floor plank) at door thresholds to cover change in floor plank pattern or direction. 14. Due to the weight of equipment on the kitchen floor and frequent water use for cleaning, Contractor shall replace entire kitchen subfloor with 4'x8'x 3/4 " CDX tongue and groove plywood whereas the long side is to be installed perpendicular to the floor joist. 1. Contractor shall use PERGO -DuraCraft Waterproof Luxury Vinyl Planks or an Approved Equal. Texture: Wirebrushed, Series Name: DuraCraft +WetProtect, Wood Species: N/A Style: Transitional, Manufacturer Color/Finish: Heirloom Estate Oak, Color/Finish Family: Owner's preference, Pieces per Carton: 7, Commercial/Residential: Commercial/Residential, Stain Resistant, Scratch Resistant, Floating, Protective Wear Layer: Urethane, Gloss Level: Low, Edge Type: Beveled, Sold As: Carton, Square Footage Per Carton (Sq. Feet): 17.43, Square Footage Per Piece (Sq. Feet): 2.49, Luxury Vinyl Plank, Warranty: Lifetime, Color Shade: Medium, Lowe's Exclusive, Thk. Measurement: 6mm - 7mm thk. Contractor must adhere to manufacture's installation requirements to ensure product lifetime warranty. 2. Visqueen PE Film Underlayment: 6 mil. thk. 3. Floor Base: New 4" rubber base with 1/2 " boot. Contractor shall include in quote an amount of $5,000.00 for laten conditions and owners request for additional work relative to the project. Funds not used during the construction of the project shall be deducted from the contractor's final payment. At the completion of project, work site must be neat and clean. 1. Contractor is advised to visit site to familiarize themselves with existing conditions, verify dimensions, and provide a sufficient work crew that does not cause any self-produced delays. 2. Contractor must provide a Performance Bond, Payment Bond, and Liability Insurance upon the receipt of a Purchase Order and prior to the Notice to Proceed. 3. Contractor must adhere to the latest edition of the Davis Bacon Act regarding worker's wages. 4. Contractor completion timeline is 30 calendar days

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents