Similar Projects
Last Updated | 04/07/2020 05:58 AM |
Project Title | TIA Band 3 Paving Improvements |
Physical Address | View project details and contacts |
City, State (County) | Swainsboro, GA 30401 (Emanuel County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be done consists of furnishing all materials, equipment and labor for the construction of: Paving Improvements 1. Lambs Bridge Road – D.O.T. P.I. 0012055: The project will consist of installation of patching, overlay with 1,726 tons of recycled asphalt concrete 9.5 mm Superpave, 2,092 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 2. Short Street – D.O.T. P.I. 0012060: The project will consist of installation of patching, overlay with 94 tons of recycled asphalt concrete 4.75 mm Mix, 171 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 3. Fortune Loop - D.O.T. P.I. 0012063: The project will consist of installation of patching, overlay with 232 tons of recycled asphalt concrete 4.75 mm Mix, 421 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 4. Prosperity Drive - D.O.T. P.I. 0012069: The project will consist of installation of patching, overlay with 444 tons of recycled asphalt concrete 4.75 mm Mix, 807 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 5. Oaklawn Drive- D.O.T. P.I. 0012066: The project will consist of installation of patching, overlay with 475 tons of recycled asphalt concrete 4.75 mm Mix, 863 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 6. West Meadow Lake - D.O.T. P.I. 0012070: The project will consist of installation of patching, overlay with 2286 tons of recycled asphalt concrete 9.5 mm Superpave, 2,771 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 7. Arden Drive - D.O.T. P.I. 0012071: The project will consist of installation of patching, overlay with 553 tons of recycled asphalt concrete 4.75 mm Mix, 1,005 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 8. Mcleod Bridge Road - D.O.T. P.I. 0012074: The project will consist of installation of patching, overlay with 1103 tons of recycled asphalt concrete 9.5 mm Superpave, 1,634 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 9. Old Nunez Road - D.O.T. P.I. 0012075: The project will consist of installation of patching, overlay with 1640 tons of recycled asphalt concrete 9.5 mm Superpave, 1,987 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 10. Lake Luck Drive - D.O.T. P.I. 0012077: The project will consist of installation of patching, overlay with 345 tons of recycled asphalt concrete 4.75 mm Mix, 37 tons of recycled asphalt leveling, 627 gallons of bitum tack coat, restriping, traffic control, and appurtenances. 11. Moreland Avenue - D.O.T. P.I. 0012079: The project will consist of installation of patching, overlay with 277 tons of recycled asphalt concrete 4.75 mm Mix, 504 gallons of bitum tack coat, restriping, traffic control, and appurtenances. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |