Similar Projects
Electric Generators Preventive Maintenance
Term Contract
Bidding
Lexington, KY

Boone County Schools - LED Upgrades
Post-Bid
KY

Virginia Avenue/Courthouse Square Utility Replacements
Post-Bid
Pineville, KY 40977

Repair of 6 Million Gallon Basin Modular Cover
Results
Kenton, KY 41048

Harlan County Maintenance Facility Sewer
Results
Less than $80,715 est. value
KY

Downtown Street Light Equipment
Alteration
Post-Bid
Lexington, KY

Sewer Rehabilitation - Contract 2
Results
Beattyville, KY

Electric Power Transmission and Distribution Franchise
Alteration
Post-Bid
Ashland, KY

Phase Two Sanitary Sewer Improvements Contract 1
Results
Less than $1,968,807 est. value
Moreland, KY

Lancaster Sanitary Sewer Extension Project
Infrastructure
Post-Bid
Lancaster, KY

Sanitary Sewer Rehabilitation Pump Station Improvements and New Force Main - Contract 2
Results
Elkton, KY

Guaranteed Energy Savings and Sustainability Master Plan and Program Implementation
Alteration
Post-Bid
KY

Emergency Generator Replacement Phase II
Results
$66,500 est. value
Hopkinsville, KY 42240

Interruptor Switches - Central Plant Substation
Alteration
Post-Bid
Murray, KY

Emergency Generator Phase I
Results
$70,000 est. value
Ashland, KY 41102

Reported 11/06/2021 12:00 AM
Project Title

Royalton Trail Town Utility System Installation

Physical Address View project details and contacts
City, State (County) Royalton, KY   (Magoffin County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Royalton Trail Town, a community and regional recreational facility, for installation of: Waterline System—1,055 feet of 2” hdpe and 2,265 feet of 1” hdpe piping, with attendant 7 pressure regulators with vaults, 10 shutoff valves with vaults and 44 anti-freeze yard hydrants; Sewer Collection System—2500 feet of 6” to 12” gravity flow SDR-35 piping, with cleanouts, 10 manholes; the installation shall also require 60 feet of 12” underground boring pipe installation; Electricity Distribution System—Close coordination with the Licking Valley RECC (LVRECC) utility, the power supplier, requiring-- 730 feet of 5-foot deep trenching/backfill for primary underground utility installation (by LVRECC), and approximately 2000 feet of 2 foot deep trenching, along with 2000 feet of 3-inch electrical conduit; 25 weather-proof 50-amp upright outlet service boxes, 32 standard crash protection bollards, to be installed at the Royalton Trail Town facility.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents