Reported | 11/06/2021 12:00 AM |
Project Title | Royalton Trail Town Utility System Installation |
Physical Address | View project details and contacts |
City, State (County) | Royalton, KY (Magoffin County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Electric, Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Royalton Trail Town, a community and regional recreational facility, for installation of: Waterline System—1,055 feet of 2” hdpe and 2,265 feet of 1” hdpe piping, with attendant 7 pressure regulators with vaults, 10 shutoff valves with vaults and 44 anti-freeze yard hydrants; Sewer Collection System—2500 feet of 6” to 12” gravity flow SDR-35 piping, with cleanouts, 10 manholes; the installation shall also require 60 feet of 12” underground boring pipe installation; Electricity Distribution System—Close coordination with the Licking Valley RECC (LVRECC) utility, the power supplier, requiring-- 730 feet of 5-foot deep trenching/backfill for primary underground utility installation (by LVRECC), and approximately 2000 feet of 2 foot deep trenching, along with 2000 feet of 3-inch electrical conduit; 25 weather-proof 50-amp upright outlet service boxes, 32 standard crash protection bollards, to be installed at the Royalton Trail Town facility. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |