Similar Projects
EHRM Infrastructure Upgrades Construction
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Iron Mountain, MI 49801

Chip and Fog Seal and Pavement Markings on Pleasantview Road
Infrastructure
Design
$232,000 CJ est. value
Pellston, MI 49769

Athletic Complex South Concessions Building - Electrical (Rebid)
Renovation
Sub-Bidding
$400,000 CJ est. value
Grand Blanc, MI 48439

Permanent Generator Replacement Project
Renovation
Sub-Bidding
$70,000 CJ est. value
Kalamazoo, MI 49007

Custodial and Light Maintenance/Repair Services for the 2021-2022
Term Contract
Post-Bid
Flint, MI

Perry Innovation Center Boiler Stack (Mechanical Only)
Post-Bid
$25,288 est. value
Grand Blanc, MI 48439

Structural Repairs / Replacements - St Louis Correctional Facility
Results
Saint Louis, MI 48880

Generator for Clinton Township Department of Public Services DPW Building
Results
$120,000 est. value
Clinton Township, MI 48036

Kearsley Community Schools District-wide Classroom Electrical Upgrades
Renovation
Sub-Bidding
$200,000 CJ est. value
Flint, MI 48502

Hapco Light Poles
Post-Bid
Brighton, MI 48114

Sunset and Tobey Elementary School - Mechanical, Electrical and Architectural Improvements
Results
$5,213,465 est. value
Scotts, Vicksburg, MI 49097

Dye Filter Controls Upgrade
Renovation
Sub-Bidding
$400,000 CJ est. value
Lansing, MI 48933

Comprehensive Performance-Based Energy Conservation Program
Alteration
Post-Bid
Morenci, MI

2021 District Mechanical/Electrical Equipment Replacements
Results
Davison, MI 48423

Chippewa Correctional Facility - Replace Emergency Generator
Renovation
Sub-Bidding
$400,000 CJ est. value
Kinross Charter Township, MI 49788

Last Updated 09/27/2022 05:07 PM
Project Title

PAW High School Gym Audio Video June 2022

Physical Address View project details and contacts
City, State (County) Paw Paw, MI 49079   (Van Buren County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project has been awarded but award amount was not confirmed. Furnish all equipment, materials, cable, labor, and engineering services to provide complete and professionally installed systems in working order and in accordance with good engineering practice. Coordinate with Paw Paw Schools District Technology Coordinator to ensure all structural rigging points and backing required to install and deploy Audio-Video equipment is provided and positioned correctly. • Coordinate with Paw Paw Schools District Technology Coordinator to ensure the necessary accommodations are made related to the facility networks and internet (e.g. VLAN requirements, network topology, security, et al.) • Coordinate with Paw Paw Schools District Technology Coordinator as required to ensure timely progress and successful integration of the sound systems. • Install, pull, and terminate all wire and cable as required for a successful installation. • Furnish any additional items, not specifically mentioned herein, to meet good engineering practice, without claim for additional payment. Such items may include, but are not limited to, hardware, transformers, terminal strips, connectors, resistors, capacitors, blank cover plates, and other Audio devices for proper installation, interface, isolation, and/or gain structure. • Furnish additional items not specifically mentioned herein as required to provide a fully functioning sound system. • Furnish shop drawings and receive Paw Paw Schools District Technology Coordinator approval prior to procurement, fabrication, and installation. • Perform initial adjustments, verification tests, and final adjustments. • Assist the Paw Paw Schools District Technology Coordinator in the Acceptance Testing of the systems. Refer to section 3.5 for detailed Acceptance Testing requirements and expectations. • Provide training of the owner's staff on all sound systems items listed. • Provide system documentation including copies of all relevant as-built documentation and equipment manuals. • Provide maintenance and warranty services for the specified period from the date of acceptance. • Note that the work scope under this section does not include the materials or installation for the AC power system except for the fabrication required within the equipment racks and where specifically called out in the contract documents. • Note that the scope of work described in this specification includes materials or installation hardware for the successful completion of this sound system specification. This includes conduit, couplings, hangers, supports, pull boxes, pull box lids, pull string, back boxes, lids/covers/blank plates for all AV boxes, and ladder tray.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents