Similar Projects
Last Updated | 09/27/2022 05:07 PM |
Project Title | PAW High School Gym Audio Video June 2022 |
Physical Address | View project details and contacts |
City, State (County) | Paw Paw, MI 49079 (Van Buren County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $40,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project has been awarded but award amount was not confirmed. Furnish all equipment, materials, cable, labor, and engineering services to provide complete and professionally installed systems in working order and in accordance with good engineering practice. Coordinate with Paw Paw Schools District Technology Coordinator to ensure all structural rigging points and backing required to install and deploy Audio-Video equipment is provided and positioned correctly. • Coordinate with Paw Paw Schools District Technology Coordinator to ensure the necessary accommodations are made related to the facility networks and internet (e.g. VLAN requirements, network topology, security, et al.) • Coordinate with Paw Paw Schools District Technology Coordinator as required to ensure timely progress and successful integration of the sound systems. • Install, pull, and terminate all wire and cable as required for a successful installation. • Furnish any additional items, not specifically mentioned herein, to meet good engineering practice, without claim for additional payment. Such items may include, but are not limited to, hardware, transformers, terminal strips, connectors, resistors, capacitors, blank cover plates, and other Audio devices for proper installation, interface, isolation, and/or gain structure. • Furnish additional items not specifically mentioned herein as required to provide a fully functioning sound system. • Furnish shop drawings and receive Paw Paw Schools District Technology Coordinator approval prior to procurement, fabrication, and installation. • Perform initial adjustments, verification tests, and final adjustments. • Assist the Paw Paw Schools District Technology Coordinator in the Acceptance Testing of the systems. Refer to section 3.5 for detailed Acceptance Testing requirements and expectations. • Provide training of the owner's staff on all sound systems items listed. • Provide system documentation including copies of all relevant as-built documentation and equipment manuals. • Provide maintenance and warranty services for the specified period from the date of acceptance. • Note that the work scope under this section does not include the materials or installation for the AC power system except for the fabrication required within the equipment racks and where specifically called out in the contract documents. • Note that the scope of work described in this specification includes materials or installation hardware for the successful completion of this sound system specification. This includes conduit, couplings, hangers, supports, pull boxes, pull box lids, pull string, back boxes, lids/covers/blank plates for all AV boxes, and ladder tray. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |