Similar Projects
National Boiler Inspection Services
Term Contract
Bidding

National Boiler Inspection Services
Term Contract
Bidding

2020 Boiler Replacement at Forest Hills Elementary School and Technology and Professional Development Center Florence City Schools
Post-Bid
Florence, AL 35633

New Water Heaters
Post-Bid
Boaz, AL 35957

Y--679-17-101, Chiller Plant Upgrades B138 Tuscaloosa VAMC, AL
Results
$2,000,000 to $5,000,000 est. value
Holt, AL 35404

AMR Gas Meter Project Material and Installation
Results
Childersburg, AL 35044

Boiler Replacement at Foster Living and Learning Complex
Post-Bid
Huntsville, AL 35811

Public Works Building Mechanical Work
Results
Less than $126,868 est. value
Orange Beach, AL 36561

Boilers and Domestic Water Heater Renovations - Jeter Primary School
Post-Bid
Less than $200,000 est. value
Opelika, AL 36801

Annual Pricing Agreement for Water Source Air Handler Replacement Coils
Term Contract
Results
Less than $2,160 est. value
Auburn, AL 36849

J079-Chiller Plant Maintenance
Post-Bid
Montgomery, Tuskegee, AL 36083

CCC Boiler Replacement Project Decatur Campus
Results
Tanner, AL 35671

J065--Installation of New Medical Gas Isolation Valves
Post-Bid
Montgomery, AL

McGee Hall Boiler Replacement
Results
Jacksonville, AL 36265

UAB West Pavilion Basement and First Floor Domestic Hot Water Return Replacement
Post-Bid
Birmingham, AL 35294

Reported 07/16/2021 12:00 AM
Project Title

Research Support Building Room 190 Replace Steam Converter

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $60,000 to $90,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is primarily a mechanical project. Contractor will demo and install (1) steam to hot water heat exchanger in Room 190 of the Research Support Building. The heat exchanger is end of life and needs to be replaced. New heat exchanger capacity and sizing will need to match existing heat exchanger being removed. A new relief valve will be installed with the new heat exchanger. All piping modifications and controls work will need to be accounted for, as well as, the logistics of old and new equipment leaving and entering the building.

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents