Similar Projects
Well and Booster Pump Equipment Maintenance Service
Bidding
Goodyear, AZ 85338

N--Install Variable Frequency Drive (VFD) Control Pannel on Pumps @ National Memorial Cemetery of Arizona
Post-Bid
Phoenix, AZ 85024

Chilled and Hot Water Loop Pump Replacement for ARS Maricopa
Post-Bid
Maricopa, AZ 85138

Pump Maintenance and Repair
Results
Avondale, AZ

Mark Wilmer Pumping Plant Unit 6 Motor Rewind
Results
Less than $3,800,000 est. value
Phoenix, AZ 85024

Valentine Well
Post-Bid
Phoenix, AZ 85027

Water Well Equipment and Services
Term Contract
Results
Tempe, AZ 85281

Dry Well And Interceptor Pumping And Inspection
Post-Bid
Phoenix, AZ

Water Wells and Pump Maintenance and Repair Services
Results
$3,000,000 est. value
Scottsdale, AZ

Trailer Mounted Water Pumps
Post-Bid
Phoenix, AZ 85003

Reservoir, Pump Station and Well Conversion
Results
Gilbert, AZ 85233

CMAR for Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Post-Bid
Gilbert, AZ 85297

Groundwater Well Cleaning Disinfection Services
Results
$20,000 to $40,000 est. value
Phoenix, AZ 85003

Chilled Water Pump
Post-Bid
Tempe, AZ 85283

Chill Pump Replacements
Results
$25,000 to $100,000 est. value
Maricopa, AZ 85138

Last Updated 03/15/2019 04:57 PM
Project Title

Barney Farms Lake Well and Barney Farms Tank Site Well

Physical Address View project details and contacts
City, State (County) Queen Creek, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor will provide all labor, materials, and equipment for the drilling and completion of two production wells for the Town of Queen Creek for the Barney Farms Lake Well and Barney Farms Tank Well. The installation of the wells, as specified herein, consists of the CONTRACTOR drilling the pilot boreholes to the specified depth using the reverse circulation rotary drilling method and collecting cutting samples from the pilot boreholes as specified.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents