Similar Projects
2022 Pavement Preservation Project
Infrastructure
Bidding
$500,000 est. value
Portland, OR

South West 7th Street and South West Kings Byway Water Main Upsizing
Infrastructure
Bidding
$400,000 est. value
Troutdale, OR 97060

NW 9th - NW Hoyt Street System Improvements - CM/GC
Infrastructure
Post-Bid
OR 97209

I-84: I-205 - Marine Drive Section of the Columbia River Highway
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value
OR

I-84: Multnomah Falls - Toothrock Tunnel - Cascade Locks
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
OR

Cornelius Pass Road Arterial Corridor Management Project On The Cornelius Pass Highway (RT. No. OR127) Near Portland
Infrastructure
Results
$1,000,000 to $2,000,000 est. value

99E MP - 4.48 to 4.86 Pavement Repair
Infrastructure
Post-Bid
Portland, OR 97239

SE 19th Avenue and SE Lambert Street Water Mains Project
Infrastructure
Results
$2,500,000 est. value
Portland, OR 97239

US30 MP 1.97 Pavement Repair
Infrastructure
Post-Bid
Portland, OR 97239

2022 Street Surfacing
Infrastructure
Results
$5,500,000 est. value
Gresham, OR

I-5 Rose Quarter Project - Early Work Package B - Right of Way Development
Infrastructure
Post-Bid
Portland, OR 97227

2022 Waterline Replacement Project
Infrastructure
Results
Gresham, OR

Stark and Buckman East Reconstruction and Green Streets
Infrastructure
Post-Bid
$20,000,000 est. value
Portland, OR

Errol Heights
Infrastructure
Results
$5,991,000 est. value
Portland, OR 34997

Hoonah Road Maintenance
Infrastructure
Results
Portland, OR

Last Updated 05/25/2022 07:33 AM
Project Title

Sunnyside South and Ladd's Reconstruction and Green Streets (ALD-06 and ALD-07)

Physical Address View project details and contacts
City, State (County) Portland, OR   (Multnomah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,668,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves the construction of combination sewer and street improvements including water quality facility basins, potable water main, water service, and hydrant.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents