Similar Projects
West Five Notch Apartments
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Augusta, SC 29841

Intersection Improvements - SC 118 (University Parkway) and S-1303 (Croft Mill Rd/Hudson Rd)
Infrastructure
Design
$2,050,000 CJ est. value
Aiken, SC 29801

Aiken MHC Pole Building Construction
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Aiken, SC 29801

Sitework Package for Highland Springs Elementary/Middle School - Phase 1
Infrastructure
Post-Bid
North Augusta, SC 29841

New Highland Springs Elementary/Middle School - Phase 1
New Construction - 14,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
North Augusta, SC 29841

Area 1 Detention Pond Clearing Project
Infrastructure
Results
SC

Public Works Campus Site Improvements
Infrastructure
Results
$567,800 est. value
Aiken, SC 29801

Tru Hotel by Hilton at Walnut Village / North Augusta
New Construction, Infrastructure
Construction
$24,400,000 CJ est. value
North Augusta, SC 29841

PAM Health Rehabilitation Hospital of Aiken
New Construction, Infrastructure
Pending Verification
$26,904,973 CJ est. value
Aiken, SC 29801

Chester White Solar Project
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Aiken, SC 29801

Aiken High School Auditorium
New Construction - 30,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Aiken, SC 29801

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

University Parkway Widening - South Carolina Department of Transportation
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Aiken, SC 29801

Olive Garden Italian Kitchen / Aiken
Demolition, New Construction, Infrastructure - 7,831 SF
Post-Bid
$2,300,000 CJ est. value
Aiken, SC 29803

North Augusta High School Restrooms and Concessions
New Construction
Results
$300,000 est. value
North Augusta, SC 29841

Last Updated 12/13/2022 11:14 AM
Project Title

Wagener-Salley High School Building Package

Physical Address View project details and contacts
City, State (County) Wagener, SC 29164   (Aiken County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $55,000,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project Number 021549.00 Scope includes but is not limited to: 1. Interior and Exterior Wall Systems: CMU and metal studs with gypsum board. 2. Floor System: Concrete slab with finishes described under finish systems. 3. Doors: a. Exterior: Hollow metal doors and frames, aluminum storefront. b. Interior: Pressed metal frames, flush, solid core wood doors, and hollow metal doors; glazed and unglazed, and labeled and unlabeled. 4. Windows: Aluminum windows, curtain wall and storefront. 5. Finishes Systems: a. Ceiling: Exposed grid with acoustical tile and soffits of steel furring with gypsum wallboard. b. Floor: Carpet, LVT, epoxy terrazzo, quarry tile, resinous. c. Walls: Painted CMU, gypsum board. 6. Storage Systems: Science Lab and Media Center wood casework and laminated plastic casework with general storage shelving. 7. Plumbing: Water, sanitary sewerage, storm drain, and fixtures. 8. Electrical System: Interior and exterior general electrical wiring for lighting and electrical outlets and a service to meet electrical requirements. 9. Lighting: Fluorescent and incandescent and controls. 10. Sitework: limited site grading. PLEASE NOTE: The overall construction budget is approximately $65 million. Value of this bid package is not yet known.

Details

2 Stories Above Grade, 151,608 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents