Similar Projects
US 12/Ackley Rd/Clover Lane - Intersection Safety Improvements
Alteration
Conception
$1,008,000 est. value
Leavenworth, WA

US 2 Et Al NCR Guardrail Update 21-23
Infrastructure
Design
$6,321,000 est. value
Leavenworth, WA 98826

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Bidding
$10,000,000 CJ est. value
Stehekin, WA 98852

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Call for Artists Highway Two Easy Street Roundabout
Infrastructure
Post-Bid
$175,000 to $200,000 est. value
Wenatchee, WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Waterville Airport Runway Edge Lighting System Replacement
Infrastructure
Bidding
$700,000 CJ est. value
Wenatchee, WA 98801

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

2022 Malaga Alcoa Hwy and S Wenatchee Avenue Intersection Improvements
Infrastructure
Bidding
$175,000 CJ est. value
Wenatchee, WA 98801

Kenzie's Landing
New Construction, Infrastructure
Post-Bid
$1,000,000 est. value
Wenatchee, WA

US 2, Stevens Pass East - Paving
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
Leavenworth, WA 98826

Kenzies Landing Trailhead Access Road Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Wenatchee, WA 98801

Last Updated 08/10/2022 06:04 PM
Project Title

Our Lady of the Assumption Catholic Church

Physical Address View project details and contacts
City, State (County) Peshastin, WA 98847   (Chelan County)
Category(s) Commercial, Education, Heavy and Highway, Industrial/Manufacturing, Religious/Funeral
Sub-Category(s) Elementary School, Industrial Warehouse, Office, Paving/Reconstruction, Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 10 2022 this project is on hold now, had no awarded bidder, the Diocese rejected all bids as they were over budget for the project. Plans call for a new worship facility to include a parish with seating for up to 450, a parish hall, rectory, classrooms, kitchen and support spaces, restrooms, storage, mechanical and office space. The parish and office building will be 10,000 square feet. The parish center and classrooms building will be 10,000 square feet and the rectory will be 2,500 square feet. Parking will accommodate 200 vehicles.

Details

,, 35,000 SF - 10,000 SF. 12,500 SF Parking Space/Stalls, 200 Parking Spaces. 12,500 SF Seats, 450 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Window Treatments, Casework, Specialty Casework, Religious Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents