Similar Projects
86 & 82 Sheppard Street Parking Lot
New Construction
Design
Charleston, SC

South Pinckney Street Parking Lot
Post-Bid
Union, SC

McCall Farms, Inc North Parking Lot Expansion 2018
Post-Bid
$315,000 est. value
Effingham, SC

Sidewalk Package S6
Results
SC

Holly Hill Pedestrian Improvements US 176, MP 16.85 - MP 17.17
Results
SC

Woodruff Streetscape
Post-Bid
$400,000 to $425,000 est. value
Woodruff, SC

Tap Sidewalk Installation
Results
SC

Streetscape Improvements Phase 1
Post-Bid
McCormick, SC

Concrete Walkway and Stairs
Results
$14,250 est. value
Duncan, SC

Generations Park Walking Trail
Post-Bid
Aiken, SC

Resurface and Restripe the Parking Lot Area
Results
$26,320 est. value
York, SC 29745

Garco and Empire Streetscape Plan
Post-Bid
North Charleston, SC

Spartanburg - TRB 94 Warehouse Parking Lot Repair
Results
$90,000 to $130,000 est. value
Duncan, SC

Viking Greenway Phase 2
Post-Bid
$70,000 to $85,000 est. value
Latta, SC

1st Avenue North Parking Lot Upgrade
Results
Surfside Beach, SC

Last Updated 12/19/2018 04:15 PM
Project Title

Under the Bridge Clock Project

Physical Address View project details and contacts
City, State (County) Anderson, SC 29621   (Anderson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Project consists of, but is not limited to, the following: This project consists of the demolition and replacement of existing curb and gutter, repaving of asphalt surface, modifications to storm drain system, landscape and irrigation system installation, decorative sidewalk installation, pavement striping, installation of new electrical system, project management, traffic control, etc. The site area is approximately 0.12 acres.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents