Last Updated | 06/10/2020 10:00 AM |
Project Title | Bridge Replacement BR. No. B-26-006=E-02-001 (Next D Beams) South Pond Road Over South Pond Inlet |
Physical Address | View project details and contacts |
City, State (County) | East Brookfield, MA 01515 (Worcester County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,741,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Ls","Schedule Of Operations - Fixed Price $14,000","100." "0.200","a","Clearing And Grubbing","101." "900.000","Ft","Tree Trimming","102.1" "7.000","Ea","Tree Protection - Armoring And Pruning","102.511" "300.000","Ft","Tree Protection - Temporary Chain Link Fence","102.522" "1.000","Ls","Modification Of Existing Flow Control Gate Assembly","107.99" "1.000","Ls","Demolition Of Superstructure Of Bridge No. e-02-001 (1fj)","114.1" "1240.000","Cy","Unclassified Excavation","120.1" "5.000","Cy","Timber Stairs & Floating Dock Removed And Stacked","120.99" "80.000","Cy","Reinforced Concrete Excavation","127.1" "260.000","Cy","Bridge Excavation","140." "10.000","Cy","Test Pit For Exploration","141.1" "30.000","Cy","Class b Rock Excavation","144." "10.000","Cy","Dredging And Disposing Of Material","148." "340.000","Cy","Ordinary Borrow","150." "75.000","Cy","Special Borrow","150.1" "2300.000","Cy","Gravel Borrow","151." "120.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "600.000","Ton","Crushed Stone","156." "4700.000","Sy","Fine Grading And Compacting","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "40.000","Hr","Personal Protection Level c Upgrade","180.02" "8.000","Hr","Licensed Site Professional Services","180.03" "13.000","Ton","Disposal Of Treated Wood Products","184.1" "1.000","Ea","Manhole","202." "1.000","Ea","Frame And Cover","221." "178.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "1.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "5.000","Sy","Stone For Pipe Ends","258." "200.000","Ft","12 Inch And Under Pipe Removed And Discarded","271.121" "440.000","Ton","Dense Graded Crushed Stone For Sub-Base","402.1" "1200.000","Sy","Pavement Micro Milling","415.3" "180.000","Mgl","Water For Roadway Dust Control","443." "290.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "270.000","Ton","Superpave Intermediate Course - 12.5 (Sic -12.5)","450.31" "490.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "13.000","Ton","Superpave Bridge Surface Course - 9.5 (Ssc-b - 9.5)","450.60" "13.000","Ton","Superpave Bridge Protective Course - 9.5 (Spc-b - 9.5)","450.70" "330.000","Ft","Hma Joint Sealant","453." "25.000","Ton","Asphalt Mixtures For Temporary Work","472." "80.000","Ft","Granite Curb Type Vb - Straight","506." "39.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "1.000","Ea","Granite Curb Inlet For Sidewalk With Steel Plate","514.9" "340.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "15.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "470.000","Ft","Timber Guardrail","620.9" "5.000","Ea","Trailing Anchorage","627.1" "4.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "4.000","Ea","Transition To Bridge Rail","628.24" "215.000","Ft","48 Inch Chain Link Fence (Pipe Top Rail) Vinyl Coated (Line Post Option)","645.148" "1350.000","Ft","Temporary Fence","657." "985.000","Ft","Temporary Fence Removed And Reset","657.5" "50.000","Cy","Stone Masonry Wall In Cement Mortar","685." "65.000","Ft","Floating Turbidity Barrier","697.3" "200.000","Sy","Geotextile Fabric For Permanent Erosion Control","698.4" "190.000","Sy","Cement Concrete Sidewalk","701." "6.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "60.000","Ton","Hot Mix Asphalt Driveway","703." "2.000","Ea","Town Line Bound Removed And Reset","711.2" "2.000","Ea","Rural Mail Box Removed And Reset","715." "18.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "120.000","Cy","Loam Borrow","751." "1.000","Ls","Inland Wetland Replication Area","755.35" "40.000","Hr","Wetland Specialist","755.75" "1.000","Ls","Wetland Monitoring Report","755.76" "850.000","Sy","Seeding","765." "430.000","Sy","Seeding - Mid-Height Upland Native Mix - Full Sun","765.4" "2100.000","Ft","Sediment Control Barrier","767.121" "950.000","Sy","Jute Mesh Erosion Control Fabric","767.731" "200.000","Sy","Composted Mulch Over Modified Rock","767.78" "410.000","Ft","Coir Fiber Log Bank Stabilization","767.95" "575.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "105.000","Ea","Live Cuttings","799.775" "42.000","Ea","Upland Shrub Plantings","799.99" "100.000","Sf","Warning-Regulatory And Route Marker - Alum. Panel (Type a)","832." "3.000","Ea","Delineation For Guard Rail Termini","833.7" "80.000","Hr","Roadway Flagger","850.41" "280.000","Sf","Safety Signing For Traffic Management","852." "450.000","Ft","Temporary Pedestrian Barricade","852.11" "2.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "4.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "40.000","Ft","Temporary Barrier (Tl-2)","853.2" "21.000","Day","Portable Changeable Message Sign","856.12" "4000.000","Day","Reflectorized Drum","859." "1700.000","Ft","6 Inch Reflectorized White Line (Thermoplastic)","866.106" "1700.000","Ft","6 Inch Reflectorized Yellow Line (Thermoplastic)","867.106" "8.000","Ea","Traffic Sign Removed And Reset","874.2" "5.000","Ea","Misc. Signs Removed And Replaced","874.99" "15.000","Cy","4000 Psi, 3/4 Inch, 610 Cement Concrete","904." "4000.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "120.000","Ea","Drilling And Grouting Dowels","912." "124.000","Ft","Treated Timber Piles","941.9" "3380.000","Ft","Steel Pile Hp 12 x 84","942.124" "26.000","Ea","Steel Pile Splice Hp 12 x 84","944.124" "2.000","Ea","Dynamic Load Test By Contractor","948.41" "26.000","Ea","Pile Shoes","948.5" "20.000","Sy","Articulated Block Slope Paving","985.9" "260.000","Ton","Modified Rockfill","986." "1.000","Ls","Control Of Water - Structure No. e-02-001 (1fj)","991.1" "1.000","Ls","Bridge Structure, Bridge No. b-26-006=e-02-001","995.01" |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |