Similar Projects
CHS and CNHMS Improvements - HVAC
Bidding
Coventry, CT 06238

HVAC Upgrades - DPW Maintenance Garage
Bidding
Stafford, CT 06614

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Maintenance and Repair Of HVAC Equipment for Town and Board of Education
Post-Bid
Hebron, CT

Israel Putnam and Northwest Quad Ventilation Upgrades
Results
$100,000 to $500,000 est. value
Storrs, CT

Osborn/Northern Boiler Rental
Results
$467,000 est. value
Somers, CT 06071

Utility Plant Services
Post-Bid
Storrs, CT 06269

Chiller Replacement at Castleman Engineering Building
Results
$100,000 to $500,000 est. value
Storrs, CT

Rome Hall, Northwest, North Dining And Shippee Ventilation Upgrades
Post-Bid
Storrs, CT 06269

Refrigeration Upgrades Mcconaughy Hall NC-11
Results
Storrs, CT 06269

Food Service Equipment Repairs
Post-Bid
Storrs, CT

Compact-Crane Lift System
Results

On-Call Services - Equipment and Material
Term Contract
Post-Bid
Stafford, CT

IDIQ JOC HVAC Phase 2
Results
Less than $500,000 est. value

Rebuilt and New Tube Bundles for Heat Exchangers
Post-Bid
Storrs, CT

Last Updated 01/04/2019 05:18 AM
Project Title

Central Utility Plant Chilled Water Plant Upgrades - Manufacturers of Chiller & Cooling Tower Equipment

Physical Address View project details and contacts
City, State (County) Storrs, CT 06269   (Tolland County)
Category(s) Single Trades
Sub-Category(s) Equipment, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Project is to replace aging equipment with four 400-ton gas fired chillers and two new two-cell replacement cooling towers (4 cells at 3,300 GPM/each) at the UConn Storrs Central Utility Plant, replace piping related to those systems, and reroute chilled water pumping/piping & controls between the CUP and Cogen chiller plant, while maintaining chilled water production. Project Schedule/Duration: Construction is planned to start: October 1, 2018. Cooling Towers are required on site by October 1, 2019. ROM Estimation: Cooling Towers - $600000 Concrete Flatwork - $70000 Rough Carpentry - $160000 Firestopping - $20000 Fire Protection - $250000
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents