Similar Projects
Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

Tabiona Ward Re-Roof
Renovation
Post-Bid
Tabiona, UT 84072

Elk Ridge 10, Mountain View 2 & 9
Renovation
Results
$300,000 CJ est. value
Payson, UT 84651

Annabella 1, 2 Landscape Renovation
Renovation
Results
$100,000 est. value
Annabella, UT 84711

Samoan Independent 7Th Day Adventist Church
New Construction - 12,500 SF
Construction
$1,688,500 est. value
Salt Lake City, UT 84104

Layton Utah Temple
New Construction - 87,000 SF
Construction
Layton, UT 84040

Calvary Condominiums
New Construction
Pending Verification
American Fork, UT 84003

Dawson Hollow Wards Re-Roof
Renovation
Pending Verification
Layton, UT 84040

COB 3Ll Chiller Re-Pipe And Heat Exchanger Addition
Renovation
Post-Bid
Salt Lake City, UT 84150

Tooele Valley Temple
New Construction - 70,000 SF
Construction
Tooele, UT 84074

Lifestone Church And Lionheart Daycare
New Construction
Pending Verification
Herriman, UT 84096

New Harmony Ward SER Repairs
Renovation
Post-Bid
New Harmony, UT 84757

Saint George Temple
New Construction - 96,277 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saint George, UT 84790

3 Triad Center Ceiling Tile Replacement
Renovation
Post-Bid
Salt Lake City, UT 84103

Logan Tabernacle Renovations
Renovation
Construction
Logan, UT

Last Updated 07/28/2022 02:32 PM
Project Title

Mount Nebo, Spanish Fork 5 and 8 Reroof

Physical Address View project details and contacts
City, State (County) Spanish Fork, UT 84660   (Utah County)
Category(s) Religious/Funeral
Sub-Category(s) Religious Facility
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF PROJECT: A. Removing existing roofing materials and installing new roofing materials with associated structural upgrades. Contractor shall be fully responsible for all labor, materials and equipment necessary for the complete construction of the work required in the Contract Documents. B. Products or systems may be provided under a Value Managed Relationship (VMR) the Owner has negotiated with the supplier. VMR products and systems are indicated as such in the Specifications. LOCATION: 1006 East 200 South, Spanish Fork, UT 84660 BID BOND: Bid security in the amount of 5 percent (5%) of the bid will accompany each bid in accordance with the Instruction to Bidders. Liquidated Damages - Conditions governing liquidated damages are specified in the General Conditions and in the Supplementary Conditions. OWNER'S RIGHT TO REJECT BIDS: The Owner reserves the right to reject any or all bids and to waive any irregularity therein.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents