Similar Projects
Hampden Branch Library Expansion - 2021 Bond - City of Denver
Addition, Demolition, Renovation, Infrastructure
Conception
$3,440,000 CJ est. value
Denver, CO 80231

Fairfield Inn & Towneplace Suites by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

Fairfield Inn & Towneplace Suites by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Accelerated Pavement Repair Concrete
Infrastructure
Post-Bid
CO

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Gateway Landing Sitework
New Construction
Construction
Denver, CO 80239

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Return to Form / Mixed-Use
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Denver, CO 80216

The Landings at Gateway
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Denver, CO 80249

I-70 Floyd Hill to Veterans Memorial Tunnels
Renovation, Infrastructure
Post-Bid
$700,000,000 CJ est. value
Denver, CO 80216

Design-Build Services for the 56th Avenue Widening Project - Peoria Street to Pena Boulevard
Results
Denver, CO 80238

Runway 35 North - Lots 2, 4 and 5 - Site Development
Infrastructure
Construction
$1,400,000 est. value
Denver, CO 80238

Last Updated 01/31/2023 02:44 PM
Project Title

Sherman Channel Project

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project work will include the construction of various surface water control systems including, grouted riprap channels, a riprap-lined diversion channel and energy dissipation zones. Excavation, material processing (screening), pile creation, channel armoring, baffle and boulder installation, riprap installation, riprap grouting, and sediment control are all components of this project. Construction is planned for 2023. Service Start : 6/12/2023 Service End : 9/30/2023 The method of contractor selection has not been determined at this time Project has been cancelled.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents