Similar Projects
Recreation Park Improvements Phase 2 - East
Design
Red Hook, NY 12571

Purchase and Installation of Basketball Goal Posts at Various Parks
Post-Bid
Poughkeepsie, NY

Bleacher Repair/Inspection
Term Contract
Post-Bid
Hopewell Junction, NY

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Wassaic Trail to the Train
Results
Wassaic, NY

One Dutchess Avenue Phase I
New Construction
Construction
$100,000,000 est. value
Poughkeepsie, NY 12601

Lighting Design
Renovation
Post-Bid
Poughkeepsie, NY 12602

Playground Safety Surfacing Fiber
Term Contract
Results
Hopewell Junction, NY

Restoration of Existing Basketball Court and Installation of 4 Pickleball Courts
Post-Bid
Hyde Park, NY 12538

Lake Taghkanic West Beach and Taconic State Park Copake Falls Playground Improvement
Results
Staatsburg, NY 12580

Construction of Franny Reese Park Improvements
Post-Bid
Wappingers Falls, NY 12590

Tennis Court Resurfacing and Pickleball Court Installation at James Baird State Park
Results
Less than $77,729 est. value
Pleasant Valley, NY 12569

Installation of Playground Equipment for College Hill Park
Post-Bid
Poughkeepsie, NY 12602

Installation of Inclusive Playground at Overocker Park
Results
Poughkeepsie, NY

2020-21 Playground Safety Surfacing Fiber
Term Contract
Post-Bid
Hopewell Junction, NY 12533

Last Updated 05/31/2019 08:06 AM
Project Title

Green Street Park Improvement

Physical Address View project details and contacts
City, State (County) Beacon, NY 12508   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Green Street Park is a half-block city park located between Union Street, Green Street, and Prospect Street in Beacon, NY. Green Street Park Improvements.General site preparation Removal of existing retaining wall and replacements with planted berms. Creation of a handicap accessible parking space and re-surfaced park entrance. Regrading and installation of storm water drainage infrastructure. Tree plantings and, Soil and erosion control installation.
Details
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents