Last Updated 12/15/2021 07:45 AM
Project Title

Shoreline Armor and Slope Stabilization

Physical Address View project details and contacts
City, State (County) Traverse City, MI   (Grand Traverse County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Mobilization, traffic control and SESC measures 2. Filling, compaction, grading, and keying in of slope to match surrounding slope and to support armoring 3. Placement of geotextile (filter) fabric beneath rip-rap and extending a minimum 10-foot distance onto the slope 4. Installation of riprap revetment: 1. Fieldstone, rough unhewn quarry stone, or broken concrete free of rebar 2. Well-graded mixture composed primarily of larger stone sizes but with a sufficient mixture of other sizes to fill the progressively smaller voids between the stones. 5. Installation of straw erosion netting and application of grass seed in areas of bare soil.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents