Similar Projects
2021 Water Distribution Pressure Sensors
Bidding
Lake Forest, IL 60045

Grand Avenue Water Main Relocation
Infrastructure
Bidding
Lake Villa, IL

Vernon Hills West Pump Station Force Main Analysis for Lake County
Post-Bid
Waukegan, IL

Wickham Court Watermain Extension
Post-Bid
Green Oaks, IL 60048

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Sanitary & Water Structure Rehabilitation
Renovation
Results
Lincolnshire, IL 60069

Forest Cove Sanitary Lift Station Replacement Project
Post-Bid
Waukegan, IL

Dugdale Road Water Main Extension
Renovation
Results
North Chicago, IL 60064

Deerpath Golf Course Cart Barn and Sprinkler System
Renovation
Post-Bid
Lake Forest, IL

14th Street Water Main Replacement
Renovation
Results
North Chicago, IL 60064

Rollins Road Water Main Improvements
Post-Bid
$168,300 est. value
Waukegan, IL

2020 Water Main Improvements
Results
Libertyville, IL 60048

Hydrant Assemblies 2021-2022
Term Contract
Post-Bid
Waukegan, IL

2020 Lincolnshire Drive Standpipe and Outfall Improvements
Results
Lincolnshire, IL 60069

Midland Force Main Replacement Phase 1A
Results
IL

Last Updated 07/28/2021 03:15 PM
Project Title

Old Grand Avenue (1st St to Fire Station) Watermain Improvement

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of approximately 154 lineal feet of 6” PVC watermain, 59 lineal feet of 8” PVC watermain, 214 lineal feet of 10” PVC watermain, 1955 lineal feet of 12” PVC watermain, 632 lin- eal feet of 12” PVC watermain installed by HDD, 101 lineal feet of 12” PVC watermain with 36” steel casing installed by jack and bore methods, 24 1.5” type “k” copper water service connections, 6 ?re hydrant assemblies, 9 non-pres- sure connections to existing watermains with valves and vaults, 3500 cubic yards of trench back?ll, 1200 square yards of 6” HMA pavement patching, 2600 square feet of sidewalk replacement, 600 lineal feet

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents