Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

Marantha Christian Academy
Build-Out - 28,000 SF
Conception
Mattoon, IL 61938

Morton College Gymnasium Acoustics
Renovation
Post-Bid
Cicero, IL 60804

2021 Capital Improvements at Lincoln ES Additional Scope
Renovation
Post-Bid
Cicero, IL 60804

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

Lester Crawl Primary Center Phase 2
Renovation
Results
Lansing, IL 60438

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Washington Elementary School Facility Expansion
Addition - 7,000 SF
Construction
Park Ridge, IL 60068

Guidepost Montessori Remodel
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$400,000 CJ est. value
Arlington Heights, IL 60004

Lincoln Trail Elementary School Renovation
Renovation - 25,000 SF
Conception
$14,000,000 est. value
Mahomet, IL 61853

Countryside Elementary School Campus and Roslyn Road Elementary School Campus
New Construction
Post-Bid
Barrington, IL

Barack Obama School Outdoor Classroom
New Construction
Results
Chicago Heights, IL 60411

Middletown Prairie Elementary School Addition
Addition - 13,000 SF
Conception
$5,000,000 est. value
Mahomet, IL 61853

CPS John Hay Community Academy MEP
Renovation
Post-Bid
Chicago, IL 60651

Neil ES-Marquee Replacement
Renovation
Results
$5,513,692 est. value
Chicago, IL 60619

Last Updated 01/26/2023 11:15 AM
Project Title

2022 John Greer and Maple School Restrooms

Physical Address View project details and contacts
City, State (County) Hoopeston, IL 60942   (Vermilion County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $219,455 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of renovating 4 existing Restrooms at Maple Grade School (500 South 4,h Street, Hoopeston, IL 60942) and 2 existing Restrooms at John Greer Grade School (609 West Main Street, Hoopeston, IL 60942), Prevailing wages in accordance with Vermilion County is required. Bid security is required, in the form of a bid bona or certified check in an amount equal to ten percent (10%) of the base bid as guarantee that the bid will not be withdrawn within 30 days after the date of openinq of bids, and that the successful bidder will enter into a Contract for the work awarded to them Bid security shall be made payable to Hoopeston Area CUSD #11. Bonds are required: Both a Performance Bond and a Labor and Payment Bond are required for this project, each in an amount equal to 100% of the contract price. Your Bid will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the owner. Award of a contract is anticipated to occur by December 16,2022, The work area wi not be available for on-sitework activities until Tuesday June 1,2021 .The Work shall be Substantially Complete on or before July 14, 2023 with Final Completion on or before July 2,8,2023. " ' All questions to be submitted to A/E by end of business Wednesday, November 23rd. If an addendum is necessary, it will be issued by Tuesday November 29th.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents