Similar Projects
Transfer Station Concrete
Alteration
Results
Sanbornton, NH

1.5 MG Water Storage Tank Rehabilitation
Renovation
Bidding
$525,000 CJ est. value
Swanzey, NH 03446

Frost Free Library Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,209,932 CJ est. value
Marlborough, NH 03455

Poverty Lane Paving
Infrastructure
Results
$338,664 CJ est. value
Lebanon, NH 03766

Highway Department Items - Block and Concrete Products
Term Contract
Results
Pelham, NH

Greenfield State Park Pot Washing Stations Slabs and Firewood Shed Foundation
Alteration
Results
Greenfield, NH 03047

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Signal / ITS Prime
Infrastructure
Post-Bid
$2,186,825 CJ est. value
Concord, NH 03301

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Reinforced Concrete Culvert Pipe Class IV and V
Term Contract
Post-Bid
Concord, NH 03301

Bleacher Concrete Pad
Alteration
Post-Bid
Windham, NH 03087

Precast Concrete Structures
Alteration
Results
Dover, NH

Tara Estates Sewer Pump Station Upgrade
Renovation
Results
$1,376,500 CJ est. value
Rochester, NH 03867

Bellamy Ridge (Red Barn Drive) Completion
Infrastructure
Post-Bid
$700,000 CJ est. value
Dover, NH 03820

Last Updated 03/18/2023 07:34 PM
Project Title

2023 Road Preservation

Physical Address View project details and contacts
City, State (County) Keene, NH 03431   (Cheshire County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $149,753 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project employs asphalt preservation techniques including crack sealing and fog-sealing treatment of existing road surfaces. Pavement markings and traffic control are ancillary to execution of the work. Engineer’s Project Estimate: $133,500 *Construction Contingency $6,500 *Emulsified Asphalt Adjustment $4,000

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents