Similar Projects
Nall 58
New Construction, Infrastructure
Design
$30,000,000 est. value
Mission, KS 66202

Paving & Striping Parking Lots Various Roane County Properties
Infrastructure
Bidding
$200,000 est. value
Topeka, KS 66612

North Park Restroom
New Construction, Infrastructure
Bidding
$250,000 est. value
Bonner Springs, KS 66012

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

Curb and Gutter Replacement
Infrastructure
Post-Bid
Topeka, KS 66606

2021 Cars 50th Street and Stateline Road
Results
$100,365 est. value
Westwood Hills, KS

K-7 and Prairie Star Parkway Interchange
Infrastructure
Results
Lenexa, KS 66220

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

Street Improvement Project
Infrastructure
Bidding
$500,000 est. value
Topeka, KS 66604

Curb and Gutter Replacement
Infrastructure
Post-Bid
Topeka, KS

82nd Street Sidewalk Improvements
Infrastructure
Results
De Soto, KS

CCLIP Pavement Surfacing Improvements, FY 2022
Infrastructure
Bidding
$400,000 est. value
Great Bend, KS

Parking Lot Resurfacing
Alteration
Post-Bid
Marion, KS

2021 Citywide 50/50 Sidewalk Program Phase 2
Infrastructure
Results
Topeka, KS

Downtown Sidewalk Improvements
Infrastructure
Post-Bid
Kingman, KS

Last Updated 07/01/2022 08:17 AM
Project Title

2022 Curb Replacement Project

Physical Address View project details and contacts
City, State (County) Tonganoxie, KS   (Leavenworth County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of Curb and Gutter removal and replacement in the area known as Willow Pointe Sub-division as highlighted on the attached map. The intent of this project is to remove and replace the curb and gutter without damaging the existing adjacent and/or abutting sidewalks or drive approaches. The specific limits of the work will be marked, (white-lined) by City of Tonganoxie staff prior to bid release and project construction. This project totals 4,669 linear feet of curb and gutter including storm sewer inlets.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents