Similar Projects
Trail Mountain Emergency Watershed Protection Project
Post-Bid
Castle Dale, UT 84513

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Culvert Bid 2020
Post-Bid
Cedar City, UT 84721

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Purchase of Culverts
Post-Bid
Cedar City, UT 84720

Parowan Pipe Lining with Centripipe Applied Liner
Results
$230,000 to $250,000 est. value
Parowan, UT

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

500 East 600 South Design
Post-Bid
Salem, UT 84653

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

Last Updated 04/15/2020 02:53 PM
Project Title

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah

Physical Address View project details and contacts
City, State (County) Mexican Hat, UT   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove 12-inches of riprap and 6-inches of gravel in order to add a bentonite amended commercial borrow soil to replace eroded radon barrier material on a 20% side slope over a 15,000 to 20,000 square foot area at the Mexican Hat Disposal Site.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents