Similar Projects
Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Well No. 34 - Drilling of a Municipal Water Well Project
Infrastructure
Bidding
$917,235 est. value
Porterville, CA

Washington Well Improvements: Well Drilling (Phase I)
Infrastructure
Bidding
$3,340,000 est. value
Santa Ana, CA 92701

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Big Horn Groundwater Well 7 Downhole Construction
Infrastructure
Post-Bid
$1,280,000 est. value
Elk Grove, CA 95757

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Granular Activated Carbon Media Suppliers for PFAS Treatment and Wells Rehabilitation
Infrastructure
Bidding
Pleasanton, CA

Maintenance, Repair, and Replacement of Irrigation Booster Pumps and Related Component
Alteration
Post-Bid
CA

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Motors, Electric, VHS, 200hp, 250hp, and 350hp
Infrastructure, Alteration
Bidding
Los Angeles, CA

Constructing Pipeline and Pump Station Project
Infrastructure
Post-Bid
Bakersfield, CA 93314

Drilling of Water Wells North Long Beach 13 and North Long Beach 14
Infrastructure
Results
$4,486,918 est. value
Long Beach, CA 90899

Construction Manager - Construction Management and Inspection Services: 1. WRF No. 2 Odor Control, 2. WRCWA Waterline, And 3. Well 22 Improvements
Renovation, Infrastructure
Bidding
Corona, CA

Reported 06/22/2022 12:00 AM
Project Title

Water Well and Pump Maintenance, Inspection, and Repair Services

Physical Address View project details and contacts
City, State (County) Soledad, CA   (Monterey County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will provide maintenance, inspection, and repair services for potable and non-potable water wells and pumps for the California Department of Corrections and Rehabilitation (CDCR), institutions and facilities throughout the State of California. 1st Site Visit on 6/8/2022 at 8:00 AM at California Mens Colony (CMC) Highway 1 San Luis Obispo, CA 93409.Contact John Philbrick via Email John.Philbrick@cdcr.ca.gov or Phone (805) 547-7973. Site Visit on 6/8/2022 at 8:00 AM at Ventura Youth Correctional Facility (VYCF) 3100 Wright Road Camarillo, CA 93010. Robert Facundus Robert.Facundus@cdcr.ca.gov 805-278-3726 Roy Calzada Roy.Calzada@cdcr.ca.gov 805-278-3737. Site Visit on 6/8/2022 at 9:00 AM at Sierra Conservation Center (SCC) 5100 O Byrnes Ferry Road Jamestown, CA 95327. Kaitlyn Drader Kaitlyn.Drader@cdcr.ca.gov. Site Visit on 6/8/2022 at 11:00 AM at California State Prison, Los Angeles County (LAC) 44750 60th Street West Lancaster, CA 93536. Russell Prolo Russell.Prolo@cdcr.ca.gov 661-729-2000 x7307. 2nd Site Visit on 6/9/2022 at 8:00 AM at California Institution for Men (CIM) 14901 Central Avenue Chino, CA 91710. Leon Kazandjian Leon.Kazandjian@cdcr.ca.gov 909-606-7082. Site Visit on 6/9/2022 at 9:00 AM at McCain Valley Conservation Camp (CC #21) 2550 McCain Valley Road Boulevard, CA 91905. Kaitlyn Drader Kaitlyn.Drader@cdcr.ca.gov . 3rd Site Visit on 6/10/2022 at 8:00 AM at Chuckawalla Valley State Prison (CVSP) 19025 Wileys Well Road Blythe, CA 92225. Gustavo Rodriguez, CPM II Gustavo.Rodriguez@cdcr.ca.gov Aderiana Aguilar, BSO Aderiana.Aguilar@cdcr.ca.gov 760-922-5300 x5225 . 4th Site Visit on 6/13/2022 at 8:00 AM at Central California Womens Facility (CCWF) 23370 Road 22 Chowchilla, CA 93610. Paul Espino, CE I Paul.Espino@cdcr.ca.gov 559-665-5531 x7904. Site Visit on 6/13/2022 at 11:00 AM at Valley State Prison (VSP) 21633 Avenue 24 Chowchilla, CA 93610. J. Keller, WWTO (CF) Jesse.Keller@cdcr.ca.gov 559-665-6100 x5848 Eric Tiller, CE I Eric.Tiller@cdcr.ca.gov 559-665-6100 x6271. 5th Site Visit on 6/14/2022 at 8:00 AM at California Correctional Institution (CCI) 24900 Highway 202 Tehachapi, CA 93581. Angel Ribera Angel.Ribera@cdcr.ca.gov 661-822-4402 x3792 Site Visit on 6/14/2022 at 9:00 AM at California Rehabilitation Center (CRC) 5th Street & Western Norco, CA 92860. Euyan Gillett Euyan.Gillett@cdcr.ca.gov 951-273-4408. Site Visit on 6/14/2022 at 11:00 AM at Wasco State Prison (WSP) 701 Scofield Avenue Wasco, CA 93280. Trinidad Rodriguez Trinidad.Rodriguez@cdcr.ca.gov 661-758-8400 x7401

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents