Similar Projects
13th Street, from Oak Street to Beaver Street Concrete Reconstruction Project - 2023
Infrastructure
Bidding
$200,000 CJ est. value
Beatrice, NE 68310

13th Street, from Oak Street to Beaver Street Concrete Reconstruction Project - 2023
Infrastructure
Bidding
$200,000 CJ est. value
Beatrice, NE 68310

Mill and Overlay Paving Projects - 2022
Infrastructure
Post-Bid
$300,000 CJ est. value
Pickrell, NE 68422

Mill and Overlay Paving Projects - 2022
Infrastructure
Post-Bid
$300,000 CJ est. value
Pickrell, NE 68422

Water System Improvements - Transmission Main
Infrastructure
Results
$2,356,200 CJ est. value
Beatrice, NE 68310

Water System Improvements - Transmission Main
Infrastructure
Results
$2,356,200 CJ est. value
Beatrice, NE 68310

New Elementary School - Beatrice Public Schools
New Construction, Infrastructure - 120,000 SF
Construction
$29,500,000 CJ est. value
Beatrice, NE 68310

New Preschool for BVCA
New Construction, Infrastructure - 5,248 SF
Post-Bid
$1,000,000 CJ est. value
Wymore, NE 68466

Lift Station No. 6 Improvements - Grinder Manhole Project - 2023
Infrastructure
Results
$38,950 CJ est. value
Beatrice, NE 68310

Beatrice Water Main Replacements
Infrastructure
Post-Bid
$300,000 CJ est. value
Beatrice, NE 68310

Alley Reconstruction, 8th Street to 9th Street, Between Court and Market Streets - 2023
Infrastructure
Results
$70,869 CJ est. value
Beatrice, NE 68310

Beatrice Elementary School - Bid Package #4
New Construction, Infrastructure
Post-Bid
$29,500,000 CJ est. value
Beatrice, NE 68310

Armor Coating Various Locations - 2023
Infrastructure
Post-Bid
Beatrice, NE 68310

Last Updated 05/02/2023 06:34 PM
Project Title

East Court Street - 24th to 26th Street Hike/Bike Trail Construction - 2023

Physical Address View project details and contacts
City, State (County) Beatrice, NE 68310   (Gage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $86,017 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is briefly described as follows: In general, the improvements on which bids are requested will require removal of approximately 16 square yards of concrete pavement 6 to 10 inches thick; 690 cubic yards of earthwork measured in embankment - borrow; 710 square yards of 6-inch concrete bike path pavement; 15.5 linear feet of 24-inch RCP storm sewer pipe and 13.3 linear feet of 15-inch CMP storm sewer pipe; installation of 1,155 square yards of Type 1C erosion control blankets, installation of 727 linear feet of silt fence, and other incidentals as indicated in the Contract Documents. Est. Completion Date: Aug. 4, 2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents