Similar Projects
Foldable Partition Doors - Westvale Elementary
Bidding
West Jordan, UT 84088

Door Closers for Warehouse Stock
Post-Bid
Salt Lake City, UT 84115

Window Safety and Security Film with Training for Paint Department
Post-Bid
Salt Lake City, UT 84115

Front Door Replacement for Multiple Buildings
Results
$100,000 to $150,000 est. value
Salt Lake City, UT 84112

Garage Roll Up Door
Results
Salt Lake City, UT 84114

Saint Mark`s Tower Window Replacement
Renovation - 89,248 SF
Post-Bid
Salt Lake City, UT

Window Treatments Guest House
Results
$30,000 to $40,000 est. value
Salt Lake City, UT 84112

Governor`s Office Glazing Replacement
Post-Bid
Salt Lake City, UT

Lock Hardware for Security Systems
Results
Salt Lake City, UT 84115

Annual Contract for Sliding Doors Repairs
Term Contract
Post-Bid
Salt Lake City, UT 84115

Door and Lock Hardware for Security Systems Stock
Results
Salt Lake City, UT

7110--Window Treatment/ Solar Shades
Post-Bid
Salt Lake City, UT

Door and Lock Hardware for Security Systems Stock
Results

Door and Cabinet Hardware
Term Contract
Post-Bid
Sandy, UT 84070

Overhead Door Maintenance, Repair, and Replacement Services
Term Contract
Results
West Jordan, UT

Last Updated 11/03/2020 01:51 PM
Project Title

Door Replacement for Huntsman Cancer Institute

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84103   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of the existing doors. Replacement doors are to match the doors of Huntsman Cancer Institute Research Center South, Building 554. Attachment A has the details of the doors that were installed in Building 554 for reference. Vendor is to confirm all measurements of the install location. Doors are to be Dura-Glide 2000. Interior color to match existing finish of the lobby.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents