Similar Projects
Hathaway Water Tower Generator and HVAC Upgrades
Alteration
Bidding
$120,000 est. value
New Bedford, MA 02740

Hathaway Water Tower Generator and HVAC Upgrades
Alteration
Bidding
$120,000 est. value
New Bedford, MA 02740

Chiller Replacement - Sub Bid
Alteration
Sub-Bidding
$1,392,000 est. value
Dartmouth, MA

Replace Five Existing Interior Chilled Water Air Handling Units
Alteration
Sub-Bidding
$1,618,750 est. value
Dartmouth, MA

Automated Metering Infrastructure Project
Post-Bid
North Attleborough, MA

Replacement of Exterior Lighting
Post-Bid
Less than $15,000 est. value
North Attleborough, MA

HVAC System Replacement at the District 5 Administration Building
Results
Less than $380,000 est. value
Taunton, MA 02718

Emergency Generator Installation
Results
Norton, MA 02766

Exterior Cleaning and Re-Painting
Alteration
Bidding
$137,500 est. value
New Bedford, MA

McLean Campus Center HVAC Upgrade - Filed Sub Bids
Alteration
Sub-Bidding
$1,618,750 est. value
Dartmouth, MA 02747

Renovation of Lobby and Security Upgrades - Corrigan MHC Sub-Bid
Post-Bid
Less than $295,000 est. value
Fall River, MA 02720

Multi-Housing Authority Electrical Services
Term Contract
Results
Less than $25,000 est. value
Stoughton, Taunton, MA 02780

Replace Five Existing Interior Chilled Water Air Handling Units
Alteration
Bidding
$1,618,750 est. value
Dartmouth, MA

On-Call Trades Specifically Painting, Electrical, Plumbing, Carpentry, Glass Window/Door Fabrication
Post-Bid
Less than $20,000 est. value
Fall River, MA 02721

Town Hall Generator and Installation
Results
$73,145 est. value
Berkley, MA

Last Updated 02/21/2022 03:34 PM
Project Title

Walsh Well PFAS Treatment, Plant Upgrades - Sub Bids

Physical Address View project details and contacts
City, State (County) Mansfield, MA 02048   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Painting, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of Owner-furnished GAC vessels, furnishing, and installing associated piping, electrical Work, control system/SCADA upgrades, Site and civil Work including septic system for the bathroom facility in the new building, construction of a concrete slab and installation of a pre-engineered metal building; process, chemical feed systems, drainage and mechanical system upgrades in the existing treatment building and all materials, equipment, services and construction inherent to the Work. This Project also includes installation of six 18-inch by 12-inch gravel packed wells; pitless adapters; submersible turbine pumps; well development; performance pumping tests; water quality testing and associated process piping and valves; and all materials, equipment, services, and construction inherent to the Work.

Details

Division 09 - Finishes, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents