Similar Projects
Scheduled and Emergency Mechanical and Millwright Services At Various Locations
Alteration
Bidding
$880,080 est. value

Hot Water Heater Replacement - General Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

Hot Water Heater Replacement - Filed Sub Bids
Post-Bid
Less than $500,000 est. value
Tewksbury, MA 01876

Top of Shafts 6, 8 and 9 Interim Improvements
Results
Less than $4,177,000 est. value
Brighton, Malden, Newton, MA

Temporary Modular Boiler for the City Hall
Results
Somerville, MA 02143

H345--Boiler Plant Controls Calibration and Testing Services.
Post-Bid
Bedford, MA 01730

Hot Water System Flushing
Results
$45,140 est. value
Dracut, MA

National Board of Boiler and Pressure Vessel Inspectors
Alteration
Post-Bid
$160,000 est. value
Tewksbury, MA 01876

Boiler Replacement at the Watertown Middle School - General Bid
Results
Less than $1,100,000 est. value
Watertown, MA 02472

Boiler Inspection
Term Contract
Post-Bid
Hanscom A F B, MA

Heating System Distribution Pump and Selected Piping Replacement at Prospect Terrace 200-1
Results
$256,000 est. value
Waltham, MA 02451

Chiller Controls
Term Contract
Post-Bid
MA

Replacement of Boiler Valve
Results
$19,500 est. value
Framingham, MA

USACE D/B B42 Replace Failing Boiler System
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Natick, MA 01760

Page Hilltop School Boiler and UV Replacement - General Bids
Results
$350,000 est. value
Ayer, MA 01432

Reported 02/11/2022 12:00 AM
Project Title

Install Point of Entry Water Filtration System

Physical Address View project details and contacts
City, State (County) Tewksbury, MA 01876   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. Project will install a point of entry water filtration system within the Saunders Building targeting iron, manganese, and PFAS. System will tie into existing cold water supply within the sub-basement. Connection to waste line will be included for system backwashing.

Details

Division 46 - Water and Wastewater Equipment, Filtration Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents