Similar Projects
Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Asphalt Patching and Bridge Approaches at Various Locations
New Construction, Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Asphalt Patching and Bridge approaches
Results
$1,000,000 to $2,500,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Pavement Maintenance
Term Contract
Results

Indian Head Rail Trail Seal Coating
Results
La Plata, MD

Fair Hill NRMA Phase 4 Paving
Results
Less than $50,000 est. value
Elkton, MD 21921

Fine Mill, Patch and Resurface
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
MD

Micro Surfacing
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

HMA Millings or Grindings - Road Shoulders
Infrastructure
Results
La Plata, MD

Street Repair Services
Alteration
Results

Last Updated 05/06/2022 08:06 AM
Project Title

MD 228 (Berry Road) EB Left Turn at Western Parkway

Physical Address View project details and contacts
City, State (County) MD   (Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Of An Additional Left Turn Lane On Eastbound Md 228 (Berry Road) At Western Parkway, With Related Signal Timing Modifications And Pedestrian And Ada Improvements At The Intersection. The Work Will Consist Of The Following: Full Depth Construction Of An Additional Left Turn Lane With Curb And Gutter, Full Depth Widening And Construction Of New Curb And Gutter, Construction Of Stormwater Management Facilities, Construction Of New Sidewalk And Ada Ramps, Storm Drain Inlet And Pipe Relocation/Replacement, Cleaning Of Existing Storm Pipes, Erosion And Sediment Control, At -Grade Pavement Resurfacing Of The Roadway Within The Project Limits, Placement Of Pavement Markings, And Signal Modifications At Md 228 & Western Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents