Similar Projects
Jefferson Avenue Footbridge Rehabilitation
Renovation, Infrastructure
Bidding
$3,200,000 est. value
Springfield, MO

Culverts, Pipe and Bridge Materials
Infrastructure
Bidding
Lexington, MO

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

11th Street over Corby Parkway Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO 64504

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

Highway N Bridge Repairs at Dardenne Creek Repairs
Results
Cottleville, MO

Bridge Modifications
Renovation, Infrastructure
Bidding
Kansas City, MO

Clay County Bridge Replacement
New Construction
Post-Bid
Liberty, MO

Washington County Bridge Replacement
Results
Potosi, MO

Milling - Bridge Deck
New Construction, Infrastructure
Bidding
Kansas City, MO

King Hill Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

Bridge Replacement
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
MO

22nd Street Over Corby Parkway Bridge Replacement
New Construction, Infrastructure
Post-Bid
Saint Joseph, MO 64504

Highland Pedestrian Bridge
New Construction
Results
Saint Joseph, MO

Last Updated 10/15/2021 11:39 PM
Project Title

Bridge Rehabilitation Over Route 6

Physical Address View project details and contacts
City, State (County) (Caldwell, Carroll, Grundy, Livingston Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J1P3252 Route 65 GRUNDY County. Bridge rehabilitation over Rte. 6 in Trenton, the total length of improvement being 0.077 miles.(2): Job J1P3255 Route 36 LIVINGSTON County. Bridge rehabilitation over Blackwell Creek, 1.2 miles east of Rte. 65 near Chillicothe, the total length of improvement being 0.087 miles.(3): Job J1S3259 Route UU CARROLL County. Bridge redeck over Turkey Creek 5.8 miles east of Rte. 65 near Carrollton, the total length of improvement being 0.114 miles.(4): Job J1S3264 Route 139 CARROLL County. Bridge redeck over Hurricane Creek 2.9 miles south of Rte. HH near Hale, the total length of improvement being 0.099 miles.(5): Job J1S3265 Route UU CARROLL County. Bridge redeck over Big Creek 5.9 miles east of Rte. 65 near Carrollton, the total length of improvement being 0.163 miles.(6): Job J1S3266 Route 116 CALDWELL County. Bridge redeck over the Union Pacific Railroad 2 miles east of Rte. 13 near Polo, the total length of improvement being 0.103 miles

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents