Similar Projects
Dutchtown Commons
New Construction - 13,479 SF
Conception
$18,000,000 est. value
Easton, PA 18042

Parkview Inn Redevelopment
New Construction
Conception
Allentown, PA 18104

Clarion at the Chip Factory Hotel
Renovation - 90,000 SF
Design
Columbia, PA 17512

Clarion Hotel Park and Jet
Addition
Design
Essington, PA 19029

Parking Access and Revenue Control Equipment - Center City Garages
Bidding
Philadelphia, PA 19106

Addition to the Wharton Township Maintenance Garage
Addition
Bidding
Farmington, PA 15437

East Parking Deck Rehabilitation
Post-Bid
University Park, PA

City Hall Parking Garage Rehabilitation
Post-Bid
Bedford, PA 15522

Courthouse Square Parking Garage Plaza Renovation
Renovation
Results
Washington, PA 15301

South Beatty and Mignonette Streets Redevelopment
Results
Pittsburgh, PA

Sora West
New Construction - 400,000 SF
Construction
$325,000,000 est. value
Conshohocken, PA 19428

Air Products Headquarters
New Construction - 624,125 SF
Construction
$100,000,000 est. value
Macungie, PA

The Beverly Apartments
New Construction
Pending Verification
Philadelphia, PA 19123

Parking Garage For Penn Presbyterian Campus
New Construction - 495,000 SF
Pending Verification
$60,000,000 est. value
Philadelphia, PA 19104

Student Housing
Renovation - 40,000 SF
Conception
Erie, PA 16501

Last Updated 05/13/2021 01:14 PM
Project Title

Maintenance Building Expansion Project - General Construction Work

Physical Address View project details and contacts
City, State (County) Towanda, PA 18848   (Bradford County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work involves site construction including trenching, grading, utility installation, erosion control, retaining wall and miscellaneous site features; building construction includes concrete spread footings and slab-on-grade, wood framing, metal siding and roofing, fiberglass insulation, doors, windows, interior partitions, built-in casework, ceilings, flooring, and paint; miscellaneous work to support other contracts as required.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents