Similar Projects
Health Center - California State University - Stanislaus
New Construction, Infrastructure - 15,600 SF
Conception
$27,773,000 CJ est. value
Turlock, CA 95382

Classroom Building II - California State University - Stanislaus
New Construction, Infrastructure - 75,189 SF
Conception
$80,426,000 CJ est. value
Turlock, CA 95382

Moffett Road / Multi-Residential
New Construction, Infrastructure - 24,500 SF
Design
$10,900,000 CJ est. value
Ceres, CA 95307

Beautification Clean California Project
Infrastructure
Design
$1,250,000 CJ est. value
Ceres, CA 95307

Highway 33 and Inyo Avenue Intersection Improvements
Infrastructure
Post-Bid
Newman, CA 95360

2020 SB1 Improvements
Infrastructure
Post-Bid
Newman, CA

General Engineering (A License) Construction, San Joaquin, Stanislaus, and Tuolumne Counties, Hetch Hetchy
Infrastructure, Alteration
Results
$5,000,000 est. value
San Joaquin, CA 93660

Pavement Rehabilitation - Phase M Albers Road, and Hickman Road
Infrastructure
Results
Less than $1,632,000 est. value
CA

Lease-Leaseback Construction Services (John Fremont Elementary School Cafeteria and Site Improvement Project) - Modesto City Schools
Renovation, Infrastructure
Construction
$9,200,000 CJ est. value
Modesto, CA 95350

Senior Playground 2014 - 100866 - City of Modesto
Infrastructure, Renovation
Construction
$957,105 CJ est. value
Modesto, CA 95354

Park Villas / Turlock
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Turlock, CA 95382

Park Villas / Turlock
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Turlock, CA 95382

Parking Structure - California State University - Stanislaus
New Construction, Infrastructure
Conception
$17,827,000 CJ est. value
Turlock, CA 95382

Replace Safety Roadside Rest Area
Infrastructure
Design
$8,284,000 CJ est. value
Westley, CA 95363

Construction Management Services for La Loma Phase 2C Strengthen and Replace Water Mains
Infrastructure
Post-Bid
$1,000,000 est. value
Modesto, CA

Last Updated 05/25/2023 12:03 AM
Project Title

Citywide Street Rehabilitation and Improvement Project Various Locations Package 1

Physical Address View project details and contacts
City, State (County) Turlock, CA 95380   (Stanislaus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $9,157,294 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work for City Project 22-001 - Package 1 consists, in general, of removal of existing pavement and base, and paving a new Hot Mix Asphalt pavement section along various streets. Work will also include curb, gutter, and sidewalk modifications, ADA ramp construction, adjustment of valve and manhole covers to grade, in-kind replacement of traffic loop detectors, striping, and traffic control.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents