Similar Projects
Metra Station and Track Realignment
New Construction, Alteration
Conception
$400,000,000 to $500,000,000 est. value
Chicago, IL 60677

Lincoln Yards - Future Phases
New Construction, Infrastructure
Conception
$5,650,000,000 CJ est. value
Chicago, IL 60614

Fuel Farm Aircraft Fueling Facility
New Construction, Alteration - 18,900 SF
Design
Wheeling, IL 60090

The 78
Term Contract, New Construction, Infrastructure - 13,000,000 SF
Design
$7,000,000,000 CJ est. value
Chicago, IL 60605

RFP - Comprehensive Plan and BNSF Railroad Corridor Subarea Plan Update
Term Contract
Bidding
La Grange, IL 60525

All Station Accessibility Program (ASAP) Lake Line - Austin Station
Infrastructure
Bidding
$1,000,000 CJ est. value
Chicago, IL 60604

Create EW2 Structural Design Packages- Engineering Service Provider
Alteration
Post-Bid
Chicago, IL 60617

Terminal 5 Landside & Parking Improvements - BP 4 - TP 11 - Cast-In-Place Concrete
New Construction
Post-Bid
Chicago, IL 60666

EW2 METRA Rock Island Bridge 87 at 79th Street Bridge Raise
Renovation, Alteration
Results
Chicago, IL 60620

PACE Northwest Transportation Center, ADA Transfer Facility
Addition, Demolition, Infrastructure, Build-out, Renovation
Results
$6,584,250 CJ est. value
Schaumburg, IL 60173

147th Street & Sibley Station Rehabilitation
Renovation, Alteration
Construction
$13,000,000 est. value
Harvey, IL 60426

Intermodal Container & Truck Chassis Storage Yard Expansion
New Construction, Addition, Alteration - 1,000 SF
Construction
Less than $500,000 CJ est. value
Chicago, IL 60652

Red Line Extension - 95th/Dan Ryan Terminal to 130th Street - Chicago Transit Authority (CTA)
New Construction, Infrastructure
Pending Verification
$2,300,000,000 CJ est. value
Chicago, IL 60604

One Central Project
New Construction, Infrastructure
Pending Verification
$20,000,000,000 CJ est. value
Chicago, IL 60605

John H. Stroger (JHS) Campus Power Plant - Cook County
Renovation
Conception
$450,000 CJ est. value
Chicago, IL 60612

Last Updated 05/15/2023 02:15 PM
Project Title

Congress Line Phase One Racine Station ADA & Traction Power Improvements

Physical Address View project details and contacts
City, State (County) Chicago, IL 60604   (Cook County)
Category(s) Industrial/Manufacturing, Transportation
Sub-Category(s) Misc. Structures, Power Plant, Railroad/Subway
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Bid Due date has been extended from November 18, 2022 to December 2, 2022. PPE for SITE VISITS: - Safety glasses - Hard hat - Hard toe shoes - Gloves (optional) Fire Rated Clothing - Required for entering the Haymarket Substation: Jumpsuit, or shirt and pants to comply with NFPA 70E CAT 2 or HRC 2 rating. Power will not be removed from the equipment nor bus duct covers removed during this site visit. Metal measuring devices or tools are NOT allowed; please utilize an alternative type to take any necessary existing measurements. Valid Substation Familiarization Training Is Required To Access Hermitage & Morgan Substations Substation Familiarization Training Via Microsoft Teams Thursday, September 29, 2022 Time: 9:00 am - 1:00 pm, CST Cost: $0.00 For Substation Familiarization Training, email RSVP to Jimmy Kingsfield, jkingsfield.tcp@transitchicago.com and copy aomokaiye@transitchicago.com; NO LATER THAN WEDNESDAY, SEPTEMBER 28, 2022, 4:00 PM, CST. Any contract resulting from this advertisement will be awarded to the lowest responsive and responsible bidder. The contractor will be required to furnish certified copies of any and all Insurance Policies required in relation to this contract prior to CTA's execution. Chicago Transit Authority hereby notifies all bidders that it will affirmatively ensure that in regard to any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. PLEASE NOTE: The right is reserved to accept any bid or any part or parts thereof or to reject any and all bids. Question Deadline 10/17/2022 at 4:30 PM CT Questions regarding this Bid must be submitted via Bonfire. For additional information, please contact Akintayo Omokaiye, Procurement Administrator, aomokaiye@transitchicago.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Hardware, Access Control Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers, Transportation Stop Shelters, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Security Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating, Multiple Seating, Pews and Benches, Benches.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents