Similar Projects
Scattered Site Bathroom Renovations
Renovation
Design
$200,000 CJ est. value
Louisville, KY 40272

2023 Annual Bid - Concrete
Term Contract
Sub-Bidding
Burlington, KY 41005

2023 Annual Bid - Concrete Retaining Wall Block
Term Contract
Sub-Bidding
Burlington, KY 41005

Crack Sealant and Tar Pot / Kettle
Alteration
Post-Bid
Erlanger, KY

Exterior Concrete Services
Infrastructure, Alteration
Post-Bid
Richmond, KY

Ready-Mixed Concrete
Infrastructure
Results
Owensboro, KY

Resurfacing and Pavement Repair on Banklick Road- Phase 1
Infrastructure
Results
$238,000 est. value
Wilder, KY 41076

Annual Concrete Maintenance
Alteration
Post-Bid
Bellevue, KY

Donna Baker Phase II
Infrastructure, Alteration
Results
Pikeville, KY 41501

Jet-A Installation
Infrastructure
Post-Bid
Hartford, KY 42347

Second Street Streetscape
Infrastructure, Alteration
Results
Pikeville, KY 41501

Gymnasium Entryway Replacement
Alteration
Post-Bid
Simpsonville, KY

Renovation to the Robert Cherry Civic Cener
Renovation - 9,300 SF
Results
$1,365,799 CJ est. value
Paducah, KY 42001

Concrete
Term Contract
Post-Bid
Owensboro, KY

Corridor Improvements Phase 2 - Shive Lane
Infrastructure
Results
Bowling Green, KY 42128

Last Updated 04/28/2023 05:16 PM
Project Title

King Middle School Restroom Facilities Renovations

Physical Address View project details and contacts
City, State (County) Harrodsburg, KY 40330   (Mercer County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $725,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed proposals for the following work will be received by the Mercer County Board of Education in the manner and on the date hereinafter specified for the furnishing of all labor, materials, supplies, tools, equipment, services, etc., necessary for the construction of King Middle School Restroom Renovations as set forth in the specifications and as shown on the drawings prepared by RossTarrant Architects, Inc., 101 Old Lafayette Avenue, Lexington, Kentucky 40502. Each Proposal shall be submitted on forms contained in the Project Manual. Proposals shall be enclosed in a sealed envelope with the following information on the outside: Sealed Bid for the: King Middle School Restroom Renovations No proposal shall be withdrawn for a period of sixty (60) days after the date of bid opening. Addenda: The last date for the Architect to receive items to be addressed in any addenda is March 2, 2023 by 12:00 p.m. EST. All requests must be submitted to the Architect in writing. Method of Receiving Bids: Bids will be received from Contractors for a Total Lump Sum Amount. All phases of the work shall be bid to and through the Contractor submitting the proposal. Bid Security in the amount of five (5) percent of each proposal submitted must accompany each Proposal in accordance with the Form of Proposal. It is the Owner's intent to purchase significant quantities of materials through direct purchase orders. After review of bids, the Owner will issue purchase orders for major material items. Refer to the Supplemental Instructions to Bidders, General Conditions, Supplementary Conditions, additional bidding documentation and Division 1 sections for additional information. Right to Reject and Waiver: The Owner reserves the right to accept any bid, to reject any or all bids, to waive any informalities in bids received where such acceptance, rejection, or waiver is considered to be in the best interest of the Owner or to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the Contract Documents. The Owner's desire to waive irregularities and informalities as to a bid shall be reviewed and final judgement made by the Kentucky Department of Education, Division of Facilities Management, prior to approval of the contract and financing plan. General Information: Federal Wage Rates are applicable. State Wage Rates are not applicable. Conflicts of interest, gratuities and kickbacks are defined in KRS 45A.445 and as provided for in KRS 45A.455 are absolutely prohibited. Preference for resident bidders shall be given as outlined in KRS 45A.90 to 45A.94. The successful bidder must supply a 100% Performance and Payment Bond as outlined in the Project Manual. Project Location: King Middle School, 961 Moberly Road, Harrodsburg, Kentucky 40330 Project Description: This project consists of renovating five restrooms at King Middle School. Restroom renovations shall include new plumbing fixtures and finishes.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents