Similar Projects
Advanced Metering Infrastructure
Infrastructure
Bidding

Advanced Metering Infrastructure
Infrastructure
Bidding

Paving, Sanitary Sewer, Storm Sewer, Water Main Improvements
Post-Bid
$3,000,000 to $3,500,000 est. value
Valley City, ND

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

South Regional Water Connection Phase 2
Results
$2,000,000 est. value
Fargo, ND

Sanitary Sewer, Water Main, Storm Sewer, Paving and Incidentals
Results
Less than $1,971,919 est. value
Fargo, ND 58102

Central School Lot Redevelopment
Post-Bid
$375,000 est. value
Wahpeton, ND

Water Transmission Line Rehabilitation
Results
Lakota, ND 58344

Southdale Farms Third Addition
Post-Bid
$7,800,000 est. value
Horace, ND

Water Main Replacement, Street Reconstruction and Incidentals
Results
Less than $3,523,290 est. value
Fargo, ND 58102

Advanced Metering Infrastructure System
Infrastructure
Post-Bid
$870,000 to $970,000 est. value
Grafton, ND

Water Main Replacement, Storm Sewer, Street Reconstruction and Incidentals
Results
$3,523,290 est. value
Fargo, ND 58102

2021 FM Diversion Pipeline Improvements Phase 1
Infrastructure
Post-Bid
Kindred, ND

Red River Valley Water Supply - Transmission Pipeline East
Results
$7,000,000 to $10,000,000 est. value
Carrington, ND

Waterline Repairs
Term Contract
Post-Bid
Mandan, ND 58554

Last Updated 10/05/2021 08:57 AM
Project Title

Southwest Pipeline Project(SWPP) Hybrid MTL Upgrades

Physical Address View project details and contacts
City, State (County) ND   (Stark County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,782,204
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally consists of furnishing and installing 40,021 lineal feet of 16" diameter PVC pipeline in the 2-3I southern work zone, 33,998 lineal feet of 12" diameter PVC pipeline in the 2-5C western work zone with an alternate bid schedule to add 7,904 lineal feet of 12" diameter PVC pipeline, and 28,354 lineal feet of 12" diameter PVC pipeline in the 2-7D northern/eastern work zone. Pipeline installation includes the furnishing and installation of several CAVs, cleanouts, manual ARVs, valves, PRVs and other appurtenant items The 2-3I southern work zone is located approximately from 11 miles south to 19 miles south of Dickinson along HWY 22, the 2-5C western work zone is approximately located between South Heart and Belfield along HWY 10, the northern/eastern work zone is located approximately 2 miles north of Dickinson from 1.5 miles west of HWY 22 to 2.5 miles east of HWY 22.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents