Similar Projects
Focus Foods Manufacturing Center
Renovation, Addition
Conception
$1,700,000 est. value
Baton Rouge, LA 70873

Adley Oaks Subdivision - Phase B
New Construction, Infrastructure, Alteration
Conception
$40,000,000 est. value
Houma, LA 70364

US 90z: Harvey Canal Tunnel Rehabilitation
Infrastructure
Design
$30,000,000 CJ est. value
New Orleans, LA 70119

Manhattan Blvd Pedestrian Improvements
Infrastructure
Design
$2,500,000 CJ est. value
Harvey, LA 70058

Ash Industries Addition
Addition
Conception
$5,000,000 est. value
Lafayette, LA 70508

Kiroli Rd Sidewalks and Ped Improvements
Infrastructure
Design
$250,000 CJ est. value
West Monroe, LA 71291

Commodore Pointe
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Baton Rouge, LA 70805

Pine Bluff Rd and Tack Allen Rd Bridges
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
West Monroe, LA 71292

Airfield Rehabilitation Program - Runway 2-20 - City of New Orleans
Infrastructure
Conception
$32,000,000 CJ est. value
New Orleans, LA 70130

Red Cut Rd and Charles Rawls Rd Bridges
Demolition, New Construction, Infrastructure
Design
$2,500,000 CJ est. value
West Monroe, LA 71292

Airfield Rehabilitation Program - Runway 11-29 - City of New Orleans
Infrastructure
Conception
$42,000,000 CJ est. value
New Orleans, LA 70130

Almonaster Avenue Bridge Rehabilitation
Infrastructure
Design
$30,000,000 CJ est. value
New Orleans, LA 70126

Omega Lift Station Upgrade - Lafayette Consolidated Government
Infrastructure
Conception
$350,000 CJ est. value
Lafayette, LA 70501

LA 119: Realign At Magnolia Plantation
Infrastructure
Design
$5,000,000 CJ est. value
Cloutierville, LA 71416

Vincent Road Ground Storage Tank - Lafayette Consolidated Government
Infrastructure
Conception
$1,500,000 CJ est. value
Lafayette, LA 70508

Last Updated 11/04/2022 10:36 AM
Project Title

John Deere & Company Plant Expansion

Physical Address View project details and contacts
City, State (County) Thibodaux, LA 70301   (Lafourche County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $29,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the addition of manufacturing space. An exact scope of work has not been released. As of November 4, 2022, this project is in planning stage. An architect and general contractor have not been announced. A firm construction timeline has not been disclosed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents