Similar Projects
Last Updated | 02/15/2021 10:34 AM |
Project Title | North Beach Street and Basswood Boulevard Intersection Improvements |
Physical Address | View project details and contacts |
City, State (County) | Fort Worth, TX (Tarrant County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of 1,804 SF of sidewalk, 7 ADA Ramps, 1,350 SY of concrete pavement; removal of 702 SY of asphalt pavement; removal of 16 trees from the existing medians in Basswood Boulevard; installation of 2,140 feet of electrical conduit for traffic signals, street lights, and ADA crossings; full intersection signal modifications with all related appurtenances; installing 4,260 SY of 11” concrete pavement, 7 ADA Ramps, 1,440 SF of 5’ sidewalk, installing 16 trees; removal and replacement of air relief valve and vault; and reconstruction of water valve vault lid. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |