Last Updated | 01/27/2023 03:08 PM |
Project Title | Unit Ventilator and Pipe Insulation Replacement at Callaway Elementary School #251 |
Physical Address | View project details and contacts |
City, State (County) | Baltimore, MD 21215 (Baltimore City County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,073,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Unit Ventilator and Pipe Insulation Replacement at Callaway Elementary School 251 Location- 3701 Fernhill Ave Baltimore, MD 21215 1. Replacement of existing hydronic piping and insulation throughout Callaway Elementary School. Piping and insulation replacement will include hydronic piping and air conditioning condensate drain piping to within 12 ft. of each unit ventilator and fan coil unit. 2. Replace existing heating water boilers. 3. Remove and reinstall ceilings in the vicinity of piping being replaced. 4. Remove and reinstall lighting in vicinity of piping being replaced. 5. Under Add Alternate No. 1, replace ceilings and lighting throughout the building. 6. Under Add Alternate No. 2, replace (6) hydronic isolation valves located in the Boiler Room and replace (2) hydronic heating system expansion tanks. 7. This project will be performed concurrently with a project under separate contract in which (32) unit ventilators and (38) fan coil units will be replaced; hydronic piping, air conditioning condensate drain and associated pipe insulation within 12 ft. of each unit will be replaced; and, pneumatic controls will be replaced with direct digital controls (DDC) throughout the school Questions Due By: November 16, 2022 by 4:00 p.m. MBE Participation (%) 22.0 African American MBE Participation (%)8.0 Women-Owned MBE Participation (%) 11.0 A. The overall goal for certified minority subcontractor participation for the ventilator replacement portion of this contract is 22% as specified in the solicitation and, which shall include sub goals of 8% for certified African American-owned businesses and 11% for certified women-owned businesses, if applicable. B. The overall goal for certified minority subcontractor participation for the pipe insulation replacement portion of this contract is 18% asspecified in the solicitation with no sub goals. All work under this contract shall be completed within twelve (12) months or 365 days |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |