Similar Projects
Engine 31 HVAC Installation - 197-108 - City of Baltimore
Alteration
Conception
$70,000 est. value
Baltimore, MD 21218

Light Rail Air Filters
Term Contract
Post-Bid
Baltimore, MD

Emergency Repairs to the Heating Systems at Various HABC Developments
Alteration
Post-Bid
Baltimore, MD

Repairs and Maintenance Services HVAC Units and Commercial Equipment
Alteration
Results
Baltimore, MD

Cooling Units Repairs
Term Contract
Results
Less than $20,000 est. value
Baltimore, MD 21215

Replacement of Direct Burial Chilled and Heating Water Valves
Renovation
Construction
$761,000 CJ est. value
Baltimore, MD 21216

Smart Chiller Replacememt
Alteration
Post-Bid
Baltimore, MD

Water Treatment Maintenance and Service
Term Contract
Results
Baltimore, MD

On-Call HVAC Repairs and Preventive Maintenance Services
Alteration
Post-Bid

Replacement of Existing Chillers and Cooling Towers at Baltimore Central Booking and Intake Center
Alteration
Results
$2,500,000 to $5,000,000 est. value
Baltimore, MD 21202

HVAC Maintenance and Repairs for MDTA Facilities
Term Contract
Post-Bid
Annapolis, Baltimore, Bel Air, Derwood, Dundalk, Elkton, Laurel, Newburg, Perryville, MD 21226

Mid-Size HVAC Units - Maintenance and Repair
Alteration
Results
Baltimore, MD

HVAC Replacement at Locust Point Recreation Center
Alteration
Post-Bid
Baltimore, MD 21230

LSB Duct Cleaning
Alteration
Results
Baltimore, MD 21215

HVAC Maintenance and Repairs for MDTA Northern and Central Region
Alteration
Post-Bid
Baltimore, MD 21222

Last Updated 01/27/2023 03:08 PM
Project Title

Unit Ventilator and Pipe Insulation Replacement at Callaway Elementary School #251

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21215   (Baltimore City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $5,073,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Unit Ventilator and Pipe Insulation Replacement at Callaway Elementary School 251 Location- 3701 Fernhill Ave Baltimore, MD 21215 1. Replacement of existing hydronic piping and insulation throughout Callaway Elementary School. Piping and insulation replacement will include hydronic piping and air conditioning condensate drain piping to within 12 ft. of each unit ventilator and fan coil unit. 2. Replace existing heating water boilers. 3. Remove and reinstall ceilings in the vicinity of piping being replaced. 4. Remove and reinstall lighting in vicinity of piping being replaced. 5. Under Add Alternate No. 1, replace ceilings and lighting throughout the building. 6. Under Add Alternate No. 2, replace (6) hydronic isolation valves located in the Boiler Room and replace (2) hydronic heating system expansion tanks. 7. This project will be performed concurrently with a project under separate contract in which (32) unit ventilators and (38) fan coil units will be replaced; hydronic piping, air conditioning condensate drain and associated pipe insulation within 12 ft. of each unit will be replaced; and, pneumatic controls will be replaced with direct digital controls (DDC) throughout the school Questions Due By: November 16, 2022 by 4:00 p.m. MBE Participation (%) 22.0 African American MBE Participation (%)8.0 Women-Owned MBE Participation (%) 11.0 A. The overall goal for certified minority subcontractor participation for the ventilator replacement portion of this contract is 22% as specified in the solicitation and, which shall include sub goals of 8% for certified African American-owned businesses and 11% for certified women-owned businesses, if applicable. B. The overall goal for certified minority subcontractor participation for the pipe insulation replacement portion of this contract is 18% asspecified in the solicitation with no sub goals. All work under this contract shall be completed within twelve (12) months or 365 days

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents