Similar Projects
Hoosier Creek Road Reconditioning
Infrastructure
Bidding
$300,000 CJ est. value
Muscoda, WI 53573

Sauk County West Square Office and Courthouse Toilet Rooms Renovation
Build-out
Bidding
$400,000 CJ est. value
Baraboo, WI 53913

Honey Creek Reach 4 Concrete Channel Repair near West Beloit Road Bridge in West Allis
Alteration
Post-Bid
Milwaukee, WI

Concrete Blocks For New South Landfill
Alteration
Post-Bid
WI

Kentuck Lake FD Garage
Alteration
Results
Eagle River, WI 54521

Polymer Concrete Vaults
Term Contract
Results
Milwaukee, WI

Entrance and Terrace Renovation University Center University of Wisconsin - River Falls - GPC
Renovation
Construction
$359,817 CJ est. value
River Falls, WI 54022

Chiller #1 Overhaul Heating & Cooling Plant
Renovation
Construction
$96,975 CJ est. value
Kenosha, WI 53144

LE Phillips Memorial Library - Concrete Polishing Bid Package 05
Alteration
Post-Bid
Eau Claire, WI 54701

2021 Concrete Rehabilitation Program
Alteration
Results
Fond du Lac, WI

Install Storm Sewer Piping
Infrastructure, Renovation
Construction
$178,689 CJ est. value
Fort McCoy, WI 54656

Beloit Readiness Center Construct Trash Enclosure
Alteration
Post-Bid
Beloit, WI 53511

2021 Miscellaneous Concrete Repairs
Alteration
Results
$20,000 est. value
Milton, WI

Engineering Hall Roof Replacement - General Bid
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Concrete Replacement Program
Alteration
Post-Bid
Sturgeon Bay, WI

Last Updated 12/13/2022 03:10 PM
Project Title

Building 6 Remodel - Central Wisconsin Center - AAC

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $13,968,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general the work consists ofrenovating the existing Building 6 on the Central Wisconsin Center (CWC) campus. The existing masonry construction one-story building with a lower level contains 46,377 gross A-2 square feet and was constructed in 1963. The building will be used for either long- or short-term care for CWC residents or for civil geriatric psychiatric patients currently cared for at Mendota Mental Health Institute (MMHI). This project will correct Life Safety Code deficiencies that were identified during a 2008 regulatory inspection and includes the installation of a fire sprinkler protection system. Mechanical, plumbing, electrical, low voltage and security systems will be replaced to bring them up to current requirements. The building envelope will be updated including insulating all exterior walls and installing psychiatric windows. The project includes demolition and remodel of the first floor and selective remodeling in the basement. The building is planned as an inpatient behavioral health hospital and will provide two (15) bed patient units each with a nurse station, activity spaces, dining room and support spaces. The first floor will be I-2 occupancy. The lower level will be Business occupancy housing staff and building support spaces. The main entrance to the building will be relocated to an accessible route on the south side facing the access drive. Site work includes replacement of existing ramps to meet ADA and various sidewalk changes to provide more accessible routes. Exterior and adjacent site lighting will be upgraded. Outdoor enclosed courtyards will also be developed for patient use. Base Bid will be received for: A single lump sum bid for All Work.26 27 Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically on the WisBuild DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents