Similar Projects
Design/Build - Installation of Owner Provided CRAC HVAC Units - Data Center
Alteration
Bidding
Pueblo, CO

SB267 Replace HVAC System Building 49 and Replace Water Softeners Building 118
Post-Bid
Less than $2,250,000 est. value
Pueblo, CO 81003

Air Conditioning Units Replacement
Post-Bid
Pueblo, CO

Building 3 HVAC Installation
Results
Less than $77,126 est. value
Pueblo, CO 81003

HVAC Installation at SDC Arts Center
Results
Pueblo West, CO 81003

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

SB267 Replace HVAC System 49 Replace Water Softener 118
Results
Less than $350,000 est. value
Pueblo, CO 81003

HVAC and Mechanical Products
Term Contract
Post-Bid

Design/Build - HVAC System Replacement at South High School
Results
Pueblo, CO 81003

Furnace Replacements Services
Term Contract
Post-Bid
Pueblo, CO

Design/Build - HVAC System Replacement at Pueblo Academy of Arts
Results
Pueblo, CO 81005

CU Denver PN20-112394 - SCPP Only
Alteration
Post-Bid
$125,000 est. value
Denver, CO 80204

FY21/DQ/PO Industrial Kitchen Blast Chiller for CMHIP NK
Results
Less than $120,000 est. value
Pueblo, CO 81003

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Heat Exchanger Tube Bundles
Results

Last Updated 06/10/2021 01:25 PM
Project Title

Replace HVAC Systems, Event Center, Colorado State Fair

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81004   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CDA has identified the following as the basic Scope of Services for this Project. - Replace five existing 50-ton rooftop units (RTUs) with new 70-ton single zone variable-airvolume RTUs - Replace existing 3-ton RTU serving Box Office Area with new “like-for-like” unit - Provide and install new furnace / condensing unit split system above ceiling of Green Room - Provide and install new 45,000 cubic feet per minute (CFM) make-up air unit to serve Arena Area - Provide and install four new 11,250 CFM power roof exhausters to serve Arena Area - Provide and install one new 300 CFM exhaust fan to serve Comm Room - Provide and install new multi-split air conditioning system to serve Box Office Area - Design, provide and install new building automation system (BAS) controls for entire HVAC system (new and existing).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents