Similar Projects
Northern Plains Nitrogen Fertilizer Plant
New Construction, Infrastructure
Conception
$200,600,000 CJ est. value
Grand Forks, ND 58202

Northern Plains Nitrogen Fertilizer Plant
New Construction, Infrastructure
Conception
$200,600,000 CJ est. value
Grand Forks, ND 58202

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Main Street - Mill and Pave
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58201

Main Street - Mill and Pave
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58201

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Career Impact Academy
New Construction, Infrastructure - 56,900 SF
Post-Bid
$28,000,000 CJ est. value
Grand Forks, ND 58201

Recycled HBP Overlay & Milling Surface County Road #6
Infrastructure
Results
$1,462,847 CJ est. value
Grand Forks, ND 58201

Recycled HBP Overlay & Milling Surface County Road #6
Infrastructure
Results
$1,462,847 CJ est. value
Grand Forks, ND 58201

Roundabout - City Of Grand Forks
Infrastructure
Pending Verification
$860,000 CJ est. value
Grand Forks, ND 58203

Roundabout - City Of Grand Forks
Infrastructure
Pending Verification
$860,000 CJ est. value
Grand Forks, ND 58203

UND SMHS - Minot Drainage Improvement
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58203

Montogomery Field Improvement
Infrastructure
Post-Bid
$600,000 CJ est. value
Grand Forks, ND 58201

West Elementary Redevelopment
Infrastructure
Results
$337,309 CJ est. value
Grand Forks, ND 58203

Last Updated 02/14/2024 12:11 PM
Project Title

WTP Expansion - Phase 5

Physical Address View project details and contacts
City, State (County) Thompson, ND 58278   (Grand Forks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $11,129,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids can be mailed to: East Central Regional Water District 1401 7th Avenue N.E. PO Box 287 Thompson, ND 58278 roject Category Code: Water/Wastewater Infrastructure, Water and Wastewater Facilities Description: The scope of work generally consists of furnishing and installing the following: Contract No.1 - General Construction: Work generally includes construction of an addition to the existing WTP with poured-in-place concrete substructure and precast concrete superstructure; procurement and installation of a 4-cell horizontal pressure filter, pre-membrane cartridge pressure filter vessels, reverse osmosis membrane skid, degasifier equipment, chemical feed system improvements, interior process piping, valves, flow meters, and associated appurtenances; heating, ventilation, and air conditioning (HVAC), plumbing and other mechanical equipment and associated ductwork construction for the building HVAC, and sanitary drainage; site piping, pond outfall structure, and concrete site paving. Contract No.2 - Mechanical Construction: Work generally includes mechanical construction related to WTP expansion, compressed air supply piping, heating, ventilation, and air conditioning (HVAC) components, general plumbing, and other mechanical equipment and associated construction for the building mechanical systems. Contract No.3 - Electrical Construction: Work generally includes electrical construction related to WTP expansion, electrical devices, lighting, and system improvements throughout the existing WTP facilities, instrumentation, controls, and network requirements, motor control centers with starters and variable frequency drives, electrical service entrance equipment, and procurement and installation of an enclosed standby diesel generator and associated transfer switch. Contract No.4 - Combined General, Mechanical, and Electrical Construction: Work includes all construction required to fully complete the Project as generally described for Contracts No.1, No.2, and No.3. This is to serve as a guarantee that the successful Bidder will enter into a Contract within fifteen (15) days of Notice of Award, in accordance with the terms of the principal's Bid and Contractor's Bond as required by law and regulations and determinations of East Central Regional Water District for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. All Work shall be performed in accordance with the Bidding Documents on file in the Office of East Central Regional Water District, Thompson, ND, where they may be seen and examined. Bidders must be licensed for the full amount of the Bid as required by North Dakota Century Code 43-07-05. Each Bid shall contain a copy of the Contractor's license or certificate of renewal thereof issued by the Secretary of State. All Bids must be submitted on the Bid Form furnished by the Engineer. No Bid will be read or considered that does not fully comply with the above provisions and other provisions contained within the Bidding Documents, and any deficient Bid submitted will be returned to the Bidder unopened. Contracts shall be awarded on the basis of the low Combined Bid or combination of low submitted individual contract bids if lower than the lowest Combined Bid by a responsible and responsive Bidder deemed most favorable to the Owner's interest. Substantial Completion - September 30, 2024 All Bids will be made on the basis of cash payment for such work. The Owner reserves the right to reject any or all Bids, and further reserves the right to award the Contract in the best interests of the Owner. The Owner reserves the right to hold the three (3) low Bids for a period of forty-five (45) days after the date of the Bid opening to complete financial arrangements. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for Bidders and Contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, Bidders must include the MBE/WBE subcontractor solicitation form in the bid package. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Bidders on this Work will be required to comply with the Presidential Executive Order No. 11246, as amended. The requirements for Bidders and Contractors under this order are explained in the Specifications. Payment for Bidding Documents is NON-REFUNDABLE. All Work shall be done according to the Bidding Documents. Bidding Documents may also be examined at the offices of AE2S in Bismarck, Fargo and Williston, ND; and Maple Grove, MN, builders exchanges in Grand Forks, Bismarck, Minot, and Fargo, ND, and in Minneapolis, MN. Quest EBidDoc(TM) Delivery Info: Download delivery fee is $25.00, file size is 132 MB Bid result- American General Contractors, Inc - Contract No. 1 - $6,780,000.00 CC Steel, LLC - Contract No. 2 - $590,000.00 Sun Electric, Inc. - Contract No. 3 - 3,759,000.00

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents