Similar Projects
Southern Post
New Construction
Conception
Roswell, GA

217 South Main
New Construction, Demolition - 29,988 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA

Spec Suite
Renovation
Design
College Park, GA 30337

The Murphy
Renovation
Design
Atlanta, GA

Centennial Yards Pre-Construction Services
Bidding
Atlanta, GA

U-Haul
New Construction
Sub-Bidding
College Park, GA 30349

Waldo's Old Fourth Ward
New Construction - 186,064 SF
Post-Bid
Atlanta, GA

Quarry Yards Mixed Use Phase I
New Construction, Renovation - 114,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Atlanta, GA

Acquisition and Redevelopment of Southern Skillet Site
Results
Roswell, GA

Construction Services for South STEM School Site
Results
Less than $1,325,800 est. value
Fairburn, GA 30213

The Hub - Peachtree Center
Renovation
Construction
Atlanta, GA 30303

725 Ponce
New Construction - 360,000 SF
Construction
$92,293,997 est. value
Atlanta, GA 30306

Radio.1611
Renovation - 200,000 SF
Pending Verification
Atlanta, GA 30318

950 West Marietta Street
Renovation - 275,000 SF
Pending Verification
Atlanta, GA

100 North Main Street
New Construction - 28,100 SF
Conception
Alpharetta, GA 30009

Last Updated 08/27/2019 09:26 AM
Project Title

T3 West Midtown at Atlantic Station

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30318   (Fulton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method
Project Status Construction Commenced August 2018, Construction Complete as of August 2019
Bids Due View project details and contacts
Estimated Value $81,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 251,787 SF - Office, 7 Stories Above Grade, 251,787 SF New Construction, Site Development.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents