Similar Projects
InIine Communities
New Construction
Design
Conyers, GA 30013

Chason Park Expansion Phase 3
New Construction
Bidding
Bainbridge, GA 39817

Construction and Repair of Trails on an Annual Contract
Alteration
Bidding
GA

Pedestrian Trail Improvements
Term Contract
Post-Bid
Tucker, GA 30084

Purchase Of Thirty-Four (34) New Sets Of Bleachers For Central Park
Post-Bid
Cumming, GA 30040

Brady Recreation Center Play Area Improvements
Results
Less than $76,888 est. value
Atlanta, College Park, GA 30337

Construction of New Athletic Practice Fields at Statesboro High School
Results
Statesboro, GA 30458

Commercial Row Commons
Renovation
Construction
Atlanta, GA 30309

Gwinnett Place Redevelopment Greenspace and Community Improvements
New Construction, Renovation
Pending Verification
Duluth, GA 30096

Renovation and Modifications at Commerce High School and Track Resurface at Commerce Middle School
Renovation
Bidding
$1,000,000 to $1,400,000 est. value
Commerce, GA 30529

Playground Equipment Repairs
Post-Bid
Milledgeville, GA 31059

Keswick Park Rain Garden Construction
Results
Chamblee, GA 30341

Powder Springs Park Improvements Phase 1
Renovation
Bidding
Powder Springs, GA

Track Resurfacing at Southeast Bulloch High School
Post-Bid
Brooklet, GA 30415

Tanger Park
Results
Locust Grove, GA 30248

Last Updated 10/12/2021 02:40 AM
Project Title

Town Park Improvements

Physical Address View project details and contacts
City, State (County) Braselton, GA   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Proposed park major improvements include: removal of existing in ground electrical outlets and installation of new inground electrical outlets; pressure washing of playground equipment and existing pavilion; construction of four (4) 18” tall circular concrete retaining wall block benches around trees; 4 new street lights installed within park; cleaning and painting of existing iron arch; installation of aluminum handrails at entrance to park; removal of existing wood post fence around park; installation of black aluminum fence with gates; installation of two new tennis court benches and trach cans; mulching of limited trails and landscape areas; planting of landscape areas.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents