Similar Projects
Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

The Motor Enclave
New Construction - 16,000 SF
Conception
$100,000,000 est. value
Tampa, FL 33610

Nolte Road Commercial Park
New Construction
Design
Saint Cloud, FL 34772

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Phase 2 Site Remediation, Building Demolition and Debris Removal
Demolition, Infrastructure
Bidding
Ormond Beach, FL 32174

Excavation Services
Infrastructure
Bidding
FL

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Forest Brooke Subdivision, Phase 1B; Active Adult Phase 4; and Phase 7
Post-Bid
Wimauma, FL

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Low-Income Housing Tax Credit Project
Results
Clearwater, FL 33758

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Harlem Heights - Site Development
New Construction
Construction
Fort Myers, FL

11134 New Kings Road RV Park
New Construction
Pending Verification
Jacksonville, FL 32219

Pace Commons
New Construction
Pending Verification
Pace, FL

Callahan Country RV & Water Park
Renovation
Conception
Callahan, FL 32011

Last Updated 09/14/2021 03:20 PM
Project Title

Chipotle - Phase 1 - Sitework

Physical Address View project details and contacts
City, State (County) Casselberry, FL 32707   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Summary: Sitework & Related re-development on 2.37 Acres of previously developed land. Sitework will consist of clearing & grubbing, grading, excavation for the retention pond, installation of stormwater, sanitary sewer, curb, roadways, and parking facilities. Vertical Shell Construction will bid within 30-45 days from the beginning of phase one. Scopes of Work Surveying, Materials Testing, Sitework, Landscape and Irrigation, Grease Trap, Paving, Utilities, Site Concrete, Masonry, Misc. Steel, Plumbing, Site Lighting, and Electrical.

Details

Division 01 - General Requirements, Vehicular Access and Parking.
Division 02 - Existing Conditions, Existing Material Assessment, Subsurface Investigation, Geotechnical Investigations, Material Testing, Demolition, Selective Site Demolition.
Division 03 - Concrete, Site-Cast Concrete.
Division 05 - Metals.
Division 26 - Electrical, Exterior Lighting, Site Lighting.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Finish Grading, Excavation and Fill, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Utility Storm Water Treatment.
Division 46 - Water and Wastewater Equipment, Oil and Grease Separation and Removal Equipment, Grease Traps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents