Similar Projects
Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Design
$20,000,000 to $100,000,000 est. value

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Design
$20,000,000 to $100,000,000 est. value

USSF Renovate Facility 55150, CCSFS, FL
Renovation
Bidding
$250,000 to $500,000 est. value
Cape Canaveral, FL 32920

(Idiq) (Satoc) For Design-Build and Construction, Continental United States (Conus) Projects Related To General Construction
Post-Bid
$1,000,000 to $3,000,000 est. value
Moore Haven, Port Mayaca, FL

(Idiq) (Satoc) For Design-Build and Construction, Continental United States (Conus) Projects Related To General Construction
Post-Bid
$1,000,000 to $3,000,000 est. value
Moore Haven, Port Mayaca, FL

Tyndall AFB, FL- Upgrade WEG Sub-scale Drone Facilities
Results
$500,000 to $1,000,000 est. value
Panama City, FL

Modifications to Converter Compressor Facility for SLS Block 1, Phase 1
Renovation
Results
FL

Long-Range Stand-Off Acquisition Facility Eglin AFB, FL
New Construction - 49,370 SF
Construction
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL 32542

Repair Command Post, Bldg 90208
Construction
$1,000,000 to $5,000,000 est. value
Hurlburt Field, FL 32544

Construction Manager at Risk - Army National Guard Readiness Center
New Construction - 83,100 SF
Design
Less than $22,500,000 est. value
Panama City, FL

NAVFAC Intermodal Staging Area Repairs
Post-Bid
Jacksonville, FL 32226

Federal Aviation Administration (Faa) has a Requirement for the Upgrade and Refurbishment of the SRG RCAG located in Sarasota, Florida
Results
$57,000 to $100,000 est. value
Sarasota, FL

KC-135 Beddown Add Flight Simulator Training, Macdill AFB, FL (Hillsborough County)
Renovation, Addition - 5,338 SF
Construction
Tampa, FL

Advance Notice - Construct Munitions Maintenance Facility and Igloos - Eglin Air Force Base, Florida
New Construction
Design
$10,000,000 to $25,000,000 est. value
Eglin AFB, FL

Aircraft Maintenance Unit (AMU) and Weapons Hangar
New Construction, Demolition - 105,041 SF
Post-Bid
$25,000,000 est. value
Hurlburt Field, FL

Last Updated 09/22/2021 03:45 AM
Project Title

Tyndall AFB Fire Station

Physical Address View project details and contacts
City, State (County) Tyndall AFB, FL   (Bay County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

BID ITEM NO. 1: 1. CONSTRUCTION OF FIRE STATION #4 FACILITY Payment under Bid Item No. 1 "Construction of Fire Station #4 Facility" shall constitute full compensation for furnishing and installation of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the new facility in accordance with the design-build Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings to a point 5 feet outside the building lines. This line item shall include applicable power and pathway infrastructure for equipment, such as the audio-visual equipment, gunshot detection system and other applicable systems. BID ITEM NO. 2: 2. CONSTRUCTION OF SUPPORTING SITEWORK FOR FIRE STATION #4 FACILITY Payment under Bid Item No. 2 "Construction of Supporting Sitework for Fire Station #4 Facility" shall constitute full compensation for furnishing and installation of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the work beyond the 5 foot building lines of the facility in accordance with the design-build Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings including but not limited to; clearing, grubbing, and grading the site, demolition of existing site improvements and utilities, site improvements, hauling spreading and disposal of any cut or fill material, the installation of all exterior utilities, sidewalks and pavements, stormwater structures and management facilities, and landscaping. The design-build Contractor shall be responsible for saw cutting and patching of pavements, sidewalks and restoration of any damaged landscaping related to the utility systems installation or demolition as part of the Base Bid costs. BID ITEM NO. 3: 3. DESIGN OF FIRE STATION #4 FACILITY AND SUPPORTING SITEWORK Payment under Bid Item No. 3 "Design of Fire Station #4 Facility and Supporting Sitework” shall constitute full compensation for furnishing all materials, plant, tools, labor costs, testing, expenses, and other associated incidentals associated with the design and preparation of design review documents, permitting with related fees and documents, and construction documents for the facility and supporting sitework for base bid and all bid options including, but not limited to following design and engineering; architectural, interior design, audio-visual design, civil, site environmental remediation design, landscape design, structural, mechanical, fire protection, electrical, cathodic protection, and communications/security systems, applicable Facility Related Controls Systems, including Gunshot Detection, all performed in accordance with design-build Request for Proposal (RFP) solicitation documents, criteria, and requirements. This JOB fee shall include all meetings and reports required during the design phase, construction phase involvement by the designers of record and their supporting team members, as well as surveying and geotechnical investigations and reports. BID OPTIONS BID ITEM NO. 4 (BID OPTION NO. 1) 4. PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES AND EQUIPMENT (FF&E) FOR FIRE STATION #4 FACILITY Payment under Bid Item No. 4 “Bid Option No. 1 Procurement and Installation of Furniture, Fixtures & Equipment (FF&E) for Fire Station #4 Facility” shall constitute full compensation for the work associated with the procurements and installation of the Furniture, Fixtures & Equipment (FF&E) Package in accordance with requirements of the Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings and the FF&E included in Appendix C of the design-build solicitation. All associated design is to be provided in the Base Bid, Bid Item No. 3. BID ITEM NO. 5 (BID OPTION NO. 2) 5. PROCUREMENT AND INSTALLATION OF AUDIO-VISUAL EQUIPMENT (A/V) FOR FIRE STATION #4 FACILITY Payment under Bid Item No. 5 “Bid Option No. 2 Procurement and Installation of Audio-Visual Equipment (A/V) for Fire Station #4 Facility” shall constitute full compensation for the work associated with the procurements and installation of the Audio Visual Package in accordance with requirements of the Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings and the Audio Visual Package included in Appendix C of the design-build solicitation. All associated design is to be provided in the Base Bid, Bid Item No. 3.

Details

Military Facility, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents