Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

San Souci Road Elevation Design
Infrastructure
Design
WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

2021 Downtown Overlay and Utility Project COB Project
Infrastructure
Bidding
$1,800,000 to $2,000,000 est. value
Bothell, WA

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Post-Bid
WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Improvement of Middle Waitsburg Road MP 6.10 To MP 7.92
Infrastructure
Results
Walla Walla, WA 99362

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Airport Road Recycling and Transfer Station Scale Replacement
Infrastructure, Alteration
Bidding
$700,000 est. value
Everett, WA

Last Updated 01/26/2022 11:29 PM
Project Title

Sumner Buckley Highway East 258Th Avenue East to West Mason Avenue

Physical Address View project details and contacts
City, State (County) Buckley, Tacoma, WA 98321   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the improvement of approximately 5.3 lane miles of Sumner-Buckley Highway East by resurfacing the roadway with Hot Mix Asphalt, upgrading the existing guardrail, regrading sections of the roadway side slope, and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents